Toronto address · Ward 15, Don Valley West
158 Rochester Ave
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Accessory Building(s)
Propose to construct new rear yard accessory structure cabana.
Applied Mar 5, 2021 · issued Mar 31, 2021 · completed Jun 14, 2022 · Permit 21 123597 BLD
- Cancelled
Small residential project · Accessory Building(s)
Proposed new rearyard accessory structure cabana.
Applied Jan 21, 2021 · completed Mar 4, 2021 · Permit 21 107334 BLD
- Closed
Small residential project · Pool fence enclosure
Proposal to install an in ground pool and associated fence enclosure
Applied Nov 20, 2020 · completed Nov 23, 2020 · Permit 20 221042 BLD
- Closed
Plumbing
Plumbing - Proposal for a new rear 2nd floor addition, new roof over rear patio and new front porch in existing detached single family dwelling.
Applied Jun 29, 2020 · issued Jun 29, 2020 · completed Jun 14, 2022 · Permit 19 129518 PLB
- Closed
Heating and ventilation
HVAC - Proposal for a new rear 2nd floor addition, new roof over rear patio and new front porch in existing detached single family dwelling.
Applied Nov 1, 2019 · issued Nov 8, 2019 · completed May 3, 2021 · Permit 19 129518 HVA
- Closed
Small residential project · Multiple projects
Proposal for a new rear 2nd floor addition, new roof over rear patio and new front porch in existing detached single family dwelling.
Applied Mar 22, 2019 · issued May 13, 2019 · completed Jun 14, 2022 · Permit 19 129518 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve (Sewer only) installation.
Applied Nov 28, 2013 · issued Nov 28, 2013 · completed May 3, 2021 · Permit 13 271562 000
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct two new canopies over the existing front and rear porches, a second storey rear addition and a new cabana.
Decision: Approved (hearing Sep 27, 2018)
Filed Aug 16, 2018 · File A0602/18NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
135 Cheltenham Ave · Minor variance
To construct a three-storey detached dwelling an integral garage and a covered front porch.
100 m away · filed Sep 8, 2026 · Hearing scheduled
124 Cheltenham Ave · Minor variance
To alter the existing detached dwelling by constructing a partially covered rear deck with upper and lower levels, and a storage room addition below.
190 m away · filed Apr 21, 2026 · Hearing scheduled
136 Cheltenham Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch and rear deck. Please note, this application was previously deferred by the Committee of Adjustment on April 30, 2026.
140 m away · filed Mar 5, 2026 · Approved
154 Rochester Ave · Minor variance
To construct a new dwelling.
30 m away · filed Jan 19, 2026 · conditional approval
136 Cheltenham Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch, basement walkout, covered deck and balcony in the rear yard of the property.
140 m away · filed Nov 20, 2025 · Refused
34 Mildenhall Rd · Minor variance
To construct an addition over the existing attached garage in conjunction with other interior and exterior alterations to the existing dwelling. Please note a previous application (A0381/25NY) with respect to the subject property was before the Committee of Adjustment on Thursday, October 23, 2025.
80 m away · filed Oct 8, 2025 · Approved
34 Mildenhall Rd · Minor variance
To legalize and maintain the existing landscape conditions. Please note this application was previously deferred Thursday, October 23, 2025.
80 m away · filed Sep 15, 2025 · Refused
115 Cheltenham Ave · Minor variance
To construct a new dwelling. Please note, this application was previously deferred Thursday, October 24, 2024.
250 m away · filed Sep 12, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.