Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

1591 Dufferin St

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for a new rear basement walkout and basement secondary suite.

    Applied Nov 3, 2020 · issued Nov 3, 2020 · completed Aug 24, 2021 · Permit 20 126496 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for a new rear basement walkout and basement secondary suite.

    Applied Mar 16, 2020 · issued Aug 5, 2020 · completed May 21, 2026 · 1 home added · Permit 20 126496 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 1525 Dufferin St · Minor variance

    190 m away · filed May 11, 2026 · Postponed

  • 47 Northcliffe Blvd · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear one-storey addition (sunroom). The existing rear one-storey ancillary building (garage) will be maintained and unaltered.

    190 m away · filed Feb 7, 2025 · Approved

  • 2 Westmount Ave · Minor variance

    To convert the existing detached garage, accessed from Regal Road, into a two-storey garden suite by constructing a second storey addition (cantilevered on the east side), located at the rear of the existing two-and-one-half-storey, three-unit, detached main dwelling (triplex). Also, to retain two existing parking spaces (one of which is undersized) on the lot, abutting Regal Road. There will be a total of four residential dwelling units on the lot.

    200 m away · filed May 31, 2024 · Approved

  • 26 Mackay Ave · Minor variance

    To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.

    220 m away · filed May 10, 2022 · Approved

  • 1502 Dufferin St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a third storey deck. Also, to convert this dwelling from two-units into four-units (one primary unit and three secondary suites).

    240 m away · filed Apr 11, 2022 · Approved

  • 45 Via Italia · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front basement walkout in order to provide direct access to the secondary suite within the basement.

    240 m away · filed Apr 7, 2022 · Approved

  • 23 Northcliffe Blvd · Minor variance

    To alter the existing 2½-storey detached dwelling by constructing a two-storey rear addition and a ground floor rear deck.

    190 m away · filed Jan 11, 2022 · Approved

  • 156 Rosemount Ave · Minor variance

    To legalize and maintain a front basement walkout of the existing 2½-storey semi-detached dwelling.

    160 m away · filed Oct 5, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.