Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

1593 Dufferin St

The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    Proposed two storey addition at the rear.

    Applied Apr 25, 2019 · issued May 10, 2019 · Permit 19 144743 BLD

    Inspections under way
  • Small residential project · Walk-Out stair

    Proposal for a basement walkout at front off the existing house.

    Applied Nov 28, 2017 · issued Dec 22, 2017 · Permit 17 268524 BLD

    Inspections under way
  • Small residential project · Walk-Out stair

    Proposal to construct basement walk out at the front of the dwelling

    Applied Nov 28, 2017 · completed Dec 12, 2017 · Permit 17 268523 BLD

    Cancelled
  • Small residential project · Second suite (New)

    Proposal to legalize the unit in the basement. proposing interconnected smoke alarms as the only area of work

    Applied Jul 6, 2016 · issued Jan 26, 2017 · completed Sep 29, 2017 · Permit 16 185862 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 1525 Dufferin St · Minor variance

    200 m away · filed May 11, 2026 · Postponed

  • 104 Lauder Ave · Minor variance

    To alter the existing two-storey detached dwelling by enclosing the rear porch into habitable space.

    250 m away · filed May 20, 2025 · Approved

  • 47 Northcliffe Blvd · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear one-storey addition (sunroom). The existing rear one-storey ancillary building (garage) will be maintained and unaltered.

    180 m away · filed Feb 7, 2025 · Approved

  • 2 Westmount Ave · Minor variance

    To convert the existing detached garage, accessed from Regal Road, into a two-storey garden suite by constructing a second storey addition (cantilevered on the east side), located at the rear of the existing two-and-one-half-storey, three-unit, detached main dwelling (triplex). Also, to retain two existing parking spaces (one of which is undersized) on the lot, abutting Regal Road. There will be a total of four residential dwelling units on the lot.

    210 m away · filed May 31, 2024 · Approved

  • 26 Mackay Ave · Minor variance

    To legalize and to maintain the existing rear detached garage which was constructed without the benefit of a permit.

    210 m away · filed May 10, 2022 · Approved

  • 1502 Dufferin St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a third storey deck. Also, to convert this dwelling from two-units into four-units (one primary unit and three secondary suites).

    250 m away · filed Apr 11, 2022 · Approved

  • 45 Via Italia · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front basement walkout in order to provide direct access to the secondary suite within the basement.

    240 m away · filed Apr 7, 2022 · Approved

  • 23 Northcliffe Blvd · Minor variance

    To alter the existing 2½-storey detached dwelling by constructing a two-storey rear addition and a ground floor rear deck.

    190 m away · filed Jan 11, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.