Toronto address · Ward 3, Etobicoke-Lakeshore
16 Alden Ave
The City of Toronto has 4 building permits since 2017 (4 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposed rear side ground and second floor addition and interior alterations.
Applied Apr 15, 2026 · issued Apr 29, 2026 · Permit 25 263176 HVA
- Inspections under way
Small residential project · Multiple projects
Proposed rear side ground and second floor addition and interior alterations.
Applied Dec 5, 2025 · issued Jan 6, 2026 · Permit 25 263176 BLD
- Inspections under way
Drains and site services
Drain - Proposed rear side ground and second floor addition and interior alterations.
Applied Dec 5, 2025 · issued Jan 6, 2026 · Permit 25 263176 DRN
- Inspections under way
Plumbing
Plumbing - Proposed rear side ground and second floor addition and interior alterations.
Applied Dec 5, 2025 · issued Jan 6, 2026 · Permit 25 263176 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one-storey rear addition and a second storey addition above the existing dwelling. A previous Committee of Adjustment application (A0025/25EYK) approved variances related to lot coverage, height, exterior main wall height, front porch encroachment, rear deck location and front canopy location.
Decision: Approved (hearing Sep 25, 2025)
Filed Aug 11, 2025 · File A0316/25EYK
- Closed
Minor variance · R addition
To construct a one-storey rear addition and a second storey addition above the existing dwelling.
Decision: Approved (hearing Apr 17, 2025)
Filed Feb 7, 2025 · File A0052/25EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
19 St George St · Minor variance
To construct a new attached garage.
200 m away · filed Jan 6, 2026 · Approved
139 Hay Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
250 m away · filed Oct 2, 2025 · Refused
139 Hay Ave · Minor variance
To construct a fourplex with an attached garage.
250 m away · filed Oct 2, 2025 · Refused
139 Hay Ave · Minor variance
To construct a fourplex with an attached garage.
250 m away · filed Oct 2, 2025 · Refused
7 Willowbrook Rd · Minor variance
To construct a one-storey rear addition.
120 m away · filed Aug 10, 2023 · Approved
20 Alden Ave · Minor variance
To construct a two-storey rear addition.
20 m away · filed Aug 27, 2022 · Approved
15 Alden Ave · Minor variance
To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0003/20EYK) approved variances relating to lot coverage, floor space index, front yard setback, side yard setbacks and parking space width.
50 m away · filed May 8, 2020 · Approved
15 Alden Ave · Minor variance
To construct a new detached dwelling with an attached garage.
50 m away · filed Jan 8, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.