Toronto address · Ward 14, Toronto-Danforth
16 Chatham Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Unknown
Make interior alterations; excavate basement level and underpin foundation walls. Lp
Applied Jul 31, 1989 · issued Aug 10, 1989 · completed Jun 27, 2023 · 1 home added · Permit 89 022606 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 57 homes · Mixed use
160 m away · Site plan · Under review · filed May 12, 2022
- Approved
13 storeys · Mixed use
380 m away · Site plan · Approved · filed Mar 24, 2022
- Approved
4 storeys · 42 homes · Residential
400 m away · Site plan · Approved · filed Jun 25, 2024
- Approved
14 storeys · 81 homes · Mixed use
430 m away · Site plan · Approved · filed Oct 1, 2024
- Under review
49 storeys · 496 homes · Mixed use
450 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
133 Hazelwood Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition (including a basement extension below), a new covered front porch with stairs, and a rear ground floor deck with stairs. Also, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
160 m away · filed Mar 3, 2026 · Approved
40 Donlands Ave · Minor variance
To alter the existing two-storey Place of Worship (Greek Orthodox Church) by constructing a two-storey addition (elevator vestibule) at the northeast corner of the building.
240 m away · filed Feb 27, 2026 · Approved
562 Jones Ave · Minor variance
To legalize and to maintain the interior alterations and conversion of the existing two-storey non-residential (Place of Worship) detached building [with an existing front porch with stairs, rear two-car integral garage, side (south) ground floor deck with stairs, side (south) second floor balcony and a rear rooftop patio] into a residential dwelling. There will be one residential dwelling unit on this lot.
120 m away · filed Aug 12, 2025 · Refused
41 Dewhurst Blvd · Minor variance
To permit the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition with a deck and stairs. There will be a total of two residential dwelling units on this lot (one unit occupying the basement and first storey, and one unit occupying the second and third storeys).
190 m away · filed Jun 19, 2025 · Approved
20 Strathmore Blvd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by converting the existing attic into habitable space.
190 m away · filed Jan 22, 2025 · Approved
108 Chatham Ave · Minor variance
To alter the rear two-storey ancillary building containing one laneway suite (currently under construction, as approved by Minor Variance Decision A0739/22TEY), by increasing the building height.
230 m away · filed Sep 25, 2024 · Approved
755 Danforth Ave · Consent
To obtain consent to a long-term lease in excess of 21 years.
240 m away · filed Jan 9, 2024 · Approved
23 Fielding Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition and a new rear ground floor deck with stairs. The existing one-storey rear addition will be demolished.
230 m away · filed Apr 24, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.