Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

160 Pape Ave

The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - PROPOSAL TO CONVERT THIRD FLOOR PARTIAL ENCLOSED SPACE TO FULLY ENCLOSED,SECOND FLOOR LAUNDRY RELOCATION

    Applied Jul 25, 2024 · issued Aug 15, 2024 · completed Dec 11, 2024 · Permit 24 187278 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to convert the third floor partially enclosed space to fully enclosed space and relocate the second floor laundry.

    Applied Jul 25, 2024 · issued Aug 1, 2024 · completed Dec 11, 2024 · Permit 24 187278 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for a third floor addition with terrace. Interior alterations to all floors, remove rear mudroom, and new rear deck. Existing detached house - SFD.

    Applied Aug 27, 2015 · issued Sep 3, 2015 · Permit 15 200219 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for a third floor addition with terrace. Interior alterations to all floors, remove rear mudroom, and new rear deck. Existing detached house - SFD.

    Applied Jul 31, 2015 · issued Aug 7, 2015 · Permit 15 200219 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 929 Queen Street East

    9 storeys · 78 homes · Mixed use

    320 m away · Site plan · Approved · filed May 3, 2023

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 27 Brooklyn Ave · Minor variance

    200 m away · filed Aug 21, 2026 · Postponed

  • 64 Brooklyn Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing one, two, and three-storey additions along the entire portion of the south side wall (including a basement level, a front integral garage, an elevator and stairs, a rear walkout basement, and a rear second storey terrace).

    160 m away · filed Apr 23, 2026 · Approved

  • 188 Pape Ave · Minor variance

    To construct a new one-storey detached ancillary building (containing a two-car garage), in the rear yard, abutting the laneway.

    100 m away · filed Mar 2, 2026 · Approved

  • 137 Boston Ave · Minor variance

    To construct a two-storey ancillary building (one-car garage and elevator on the main level, and one laneway suite on the second level), in the rear yard, abutting the laneway.

    230 m away · filed Jul 17, 2025 · Approved

  • 188 Pape Ave · Minor variance

    To alter the existing two-storey detached dwelling by reconstructing a side (south) basement walkout, and to construct a rear two-storey addition with basement (replaces the existing one-storey). There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling and one unit occupying the laneway suite proposed as of right/not part of this application). The existing rear detached garage will be demolished.

    100 m away · filed Jun 5, 2025 · Approved

  • 14 Blong Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    110 m away · filed Apr 22, 2025 · Approved

  • 53 Boston Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (with basement extension below), a rear ground floor deck with stairs (the existing rear deck and stairs will be demolished), and a rear basement walkout.

    50 m away · filed Dec 3, 2024 · Approved

  • 43 Boston Ave · Minor variance

    To alter the existing two-storey rowhouse dwelling by constructing a new front basement walkout with stairs for the purposes of accommodating a secondary suite. Also, to reconstruct the rear ground level deck. There will be two dwellings on the lot (duplex).

    50 m away · filed Sep 5, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.