Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

160 The Esplanade

The City of Toronto has 7 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Building rehabilitation project phase 2/3 - brick masonry cladding remedial work, concrete repairs to parking garage

    Applied Mar 31, 2023 · issued May 2, 2023 · completed Jul 17, 2024 · Permit 23 129448 BLD

    Closed
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    Domestic and Heating Boilers replacement

    Applied Jun 14, 2022 · issued Jul 12, 2022 · completed Mar 27, 2023 · Permit 22 161857 MSA

    Closed
  • Addition or alteration · Balcony/Guard repairs

    Building rehabilitation project phase 1 - brick repairs, balconcy waterproofing

    Applied Jun 9, 2022 · issued Jul 19, 2022 · completed Dec 7, 2022 · Permit 22 159778 BLD

    Closed
  • Fire and security upgrade · Fire alarm

    Proposal to upgrade the fire alarm system in existing multiple use building (3 storey plus basement). Convenience address is 158 The Esplanade.

    Applied Apr 2, 2019 · issued May 3, 2019 · Permit 19 134356 FSU

    Permit issued
  • Addition or alteration · Window replacement

    Proposal for window replacement - 400 windows - to residential units in existing multiple unit building. Convenience address is 158 The Esplanade.

    Applied May 16, 2018 · issued Jun 12, 2018 · Permit 18 159709 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Seperating a floor space on the second level of a three storey building into two units.creating a common area corridor

    Applied May 25, 2017 · issued Jun 12, 2017 · Permit 17 166353 BLD

    Inspections under way
  • Heating and ventilation

    Hvac - seperating a floor space on the second level of a three storey building into two units.creating a common area corridor

    Applied May 25, 2017 · issued Jun 27, 2017 · Permit 17 166353 HVA

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Front St E · Minor variance

    To alter the existing mixed-use building by designating 37 of the 43 non-residential parking spaces (located on the B-1 level) as a "Public Parking" use with the intent of permitting 20 of the 37 parking spaces to be leased as valet parking to a proposed hotel (municipally known as 197 King Street East) and the remaining 17 parking spaces to be rented to members of the public on a monthly basis.

    170 m away · filed Sep 15, 2022 · Approved

  • 110 George St S · Minor variance

    To alter the existing 11-storey apartment building, from the original building permit, by removing four vehicle parking spaces in order to construct a new storage and bicycle room on Parking Level 1.

    110 m away · filed Aug 23, 2021 · Approved

  • 140 The Esplanade · Minor variance

    To alter parking level one of the existing mixed-use building by converting four parking spaces into two accessible parking spaces.

    120 m away · filed Jul 8, 2021 · Approved

  • 197 King St E · Minor variance

    To alter the existing 4-storey mixed-use building by constructing additions above and to the rear resulting in an 8-storey mixed use building containing a commercial restaurant use at the ground floor and basement with hotel suites above.

    230 m away · filed Oct 30, 2019 · Approved

  • 159 Frederick St · Minor variance

    To alter the 11-storey mixed-use building by converting a portion of the basement into office space.

    210 m away · filed Jun 12, 2019 · Approved

  • 120 Front St E · Minor variance

    To convert 41 existing underground parking spaces (currently designated for office use) to a commercial parking garage. There will be 90 parking spaces in total: 45 residential, 4 office, and 41 in the new commercial parking garage. No change to the built form is proposed.

    170 m away · filed Sep 15, 2017 · Withdrawn

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.