Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

163 Chaplin Cres

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal to construct rear two storey addition with finished basement and interior alterations to ground and second floor.

    Applied Oct 19, 2011 · issued Nov 4, 2011 · Permit 11 295407 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 222 Chaplin Cres · Minor variance

    To alter the existing one-storey detached by constructing a complete second storey addition, and a front and side (east) one-storey addition (with a basement addition below). A portion of the existing driveway at the southeast corner of the lot will be reconstructed.

    240 m away · filed Sep 14, 2026 · Postponed

  • 35 Braemar Ave · Minor variance

    To construct a new two-storey detached ancillary building (to contain one garden suite with two parking spaces), in the rear yard of the existing two-storey detached dwelling. There will be a total of four residential dwelling units on this lot (three units within the main building, and one unit within the ancillary building).

    180 m away · filed Apr 15, 2026 · Approved

  • 38 Braemar Ave · Minor variance

    To construct a new three-storey detached dwelling with a front integral garage, a front second level porch with stairs, and a rear second level deck with stairs.

    210 m away · filed Mar 6, 2025 · Approved

  • 205 Forest Hill Rd · Minor variance

    To construct a new three-storey detached dwelling with an integral garage, a rear ground floor deck, a rear second storey balcony, a rear third storey terrace, and a rear basement walkout.

    100 m away · filed Dec 2, 2024 · Approved

  • 1 Braemar Ave · Minor variance

    To legalize and to maintain the rear third storey addition and the front second storey balcony that were constructed without an authorized building permit and beyond Minor Variance Decision A1072/20TEY. Also, to alter the existing two-storey detached dwelling by extending the front ground floor porch with new front stairs, constructing a new cold room underneath in the basement, and constructing a rear second storey balcony.

    60 m away · filed Jan 19, 2024 · Approved

  • 38 Braemar Ave · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, a front covered porch, a rear basement walkout with a terrace, and a rear first level deck.

    210 m away · filed Oct 16, 2023 · Approved

  • 102 Highbourne Rd · Minor variance

    To construct a new three-storey detached dwelling with a front covered ground floor porch, a rear covered ground floor deck, and a front yard parking pad.

    210 m away · filed Apr 5, 2023 · Approved

  • 42 Braemar Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage), in the rear yard.

    230 m away · filed Mar 31, 2023 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.