Toronto address · Ward 19, Beaches-East York
164 Beech Ave
The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Alter plans as approved under file 04-162837 by re-constructing fire box & replace chimney liner to existing fire-place on first floor.Existing Use: SFD Detached House Proposed : same
Applied Nov 30, 2004 · issued Dec 17, 2004 · Permit 04 162837 BLD (revision 01)
- Inspections under way
Heating and ventilation
HVAC - BUILD NEW ONE-STOREY REAR ADDITION, INSULATE THIRD STOREY KNEE WALLS, MOVE TWO WINDOWS ON SECOND FLOOR, REFRAME THREE WINDOWS ON THIRD FLOOR - Addition(s)
Applied Oct 20, 2004 · issued Nov 4, 2004 · Permit 04 168573 HVA
- Inspections under way
Plumbing
Plumbing - BUILD NEW ONE-STOREY REAR ADDITION, INSULATE THIRD STOREY KNEE WALLS, MOVE TWO WINDOWS ON SECOND FLOOR, REFRAME THREE WINDOWS ON THIRD FLOOR - Addition(s) (install fixtures see attached list and install 4" sanitary drain "plans"
Applied Oct 20, 2004 · issued Oct 22, 2004 · Permit 04 168573 PLB
- Inspections under way
Small residential project · Addition(s)
Build new one-storey rear addition, insulate third storey knee walls, move two windows on second floor, reframe three windows on third floor
Applied Aug 24, 2004 · issued Aug 24, 2004 · Permit 04 168573 BLD
- Inspections under way
Small residential project · Interior alterations
Interior alterations to convert back to a SFD.
Applied Aug 3, 2004 · issued Aug 4, 2004 · Permit 04 162837 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations to convert back to a SFD. - Interior Alterations
Applied Aug 3, 2004 · issued Aug 5, 2004 · Permit 04 162837 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
153 Willow Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor deck and a rear second floor deck.
180 m away · filed Oct 30, 2024 · Approved
97 Spruce Hill Rd · Minor variance
To construct a new two-storey ancillary building (containing a one-car garage, and one laneway suite), in the rear yard, abutting the laneway. The existing shed will be demolished.
60 m away · filed May 6, 2024 · Approved
157 Maclean Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing rear one-storey and two-storey additions, a front porch with stairs, and a rear yard pergola. Also, to construct a one-storey ancillary building (detached garage) in the rear yard.
250 m away · filed Nov 4, 2022 · Approved
4 Pine Ter · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey addition (dormer).
150 m away · filed Sep 27, 2022 · Approved
132 Willow Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a second storey addition above the rear one-storey portion of the dwelling. Also, to construct a new one-storey ancillary building (detached two-car garage) in the rear yard, abutting the laneway.
210 m away · filed Jul 6, 2022 · Approved
185 Beech Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a deck.
70 m away · filed Mar 23, 2022 · Approved
18 Cedar Ave · Minor variance
To alter the existing detached garage in the rear yard by constructing a new rooftop deck with stairs.
110 m away · filed Jan 27, 2022 · Approved
113 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front and rear basement addition and interior alterations to the basement to accommodate an undersized integral garage.
150 m away · filed Jan 24, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.