Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

165 Franklin Ave

The City of Toronto has 7 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Convert the existing basement to a secondary unit

    Applied Mar 27, 2021 · issued Apr 12, 2021 · completed Dec 6, 2021 · Permit 21 132962 PLB

    Closed
  • Drains and site services

    Drain - Convert the existing basement to a secondary unit

    Applied Mar 27, 2021 · issued Apr 12, 2021 · completed Dec 3, 2021 · Permit 21 132962 DRN

    Closed
  • Small residential project · Second suite (New)

    Convert the existing basement to a secondary unit

    Applied Mar 27, 2021 · issued Apr 12, 2021 · completed Feb 19, 2026 · 1 home added · Permit 21 132962 BLD

    Closed
  • Small residential project · Underpinning

    REV01: basement walkout

    Applied Aug 13, 2020 · issued Oct 19, 2020 · completed Jun 2, 2021 · Permit 20 100169 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal for underpinning for end unit row townhouse. The underpinning to the external wall not the party wall (as per owner information).

    Applied Jun 9, 2020 · issued Jul 14, 2020 · completed Dec 6, 2021 · Permit 20 100169 PLB

    Closed
  • Drains and site services

    Drain - Proposal for underpinning for end unit row townhouse. The underpinning to the external wall not the party wall (as per owner information).

    Applied Jun 9, 2020 · issued Jul 14, 2020 · completed Dec 6, 2021 · Permit 20 100169 DRN

    Closed
  • Small residential project · Underpinning

    Proposal for underpinning for end unit row townhouse. The underpinning to the external wall not the party wall (as per owner information).

    Applied Jan 2, 2020 · issued Jul 14, 2020 · completed Jun 2, 2021 · Permit 20 100169 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 96 Edwin Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front second storey dormer, and a rear one-storey addition, a second storey addition with a deck, and a ground level deck.

    150 m away · filed Mar 10, 2025 · Approved

  • 267 Symington Ave · Minor variance

    To construct a new two-storey semi-detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    250 m away · filed May 14, 2024 · Approved

  • 20 Hugo Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial ground floor side (east) addition, and a second storey rear addition (cantilevered over the existing one-storey portion of the building). The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.

    250 m away · filed Apr 16, 2024 · Approved

  • 265 Symington Ave · Minor variance

    To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.

    240 m away · filed Apr 6, 2024 · Approved

  • 9 Hugo Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front covered porch into habitable space), and a rear second storey addition.

    210 m away · filed Feb 13, 2024 · Approved

  • 38 Hugo Ave · Minor variance

    To construct a second storey on the existing rear ancillary building (detached garage) and convert it into a two-storey laneway suite. The existing parking spaces within the ground floor of the garage will be removed. The existing two-storey detached main dwelling on the lot will remain unaltered.

    230 m away · filed Nov 15, 2023 · Withdrawn

  • 5 Ruskin Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front covered porch, a rear two-storey addition, a partial third storey addition with a rooftop deck (located on the east side), and a rear ground floor deck.

    230 m away · filed Aug 8, 2023 · Approved

  • 317 Perth Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.

    220 m away · filed Apr 11, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.