Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

166 Van Dusen Blvd

The City of Toronto has 8 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposed interior alterations to convert existing basement to second suite.

    Applied Jan 8, 2026 · issued Jan 8, 2026 · Permit 25 267321 PLB

    Inspections under way
  • Small residential project · Second suite (New)

    Proposed interior alterations to convert existing basement to second suite.

    Applied Dec 17, 2025 · issued Jan 8, 2026 · 1 home added · Permit 25 267321 BLD

    Inspections under way
  • Heating and ventilation

    Revision to HVAC design.

    Applied Aug 23, 2017 · issued Aug 29, 2017 · completed Apr 20, 2018 · Permit 17 132536 HVA (revision 01)

    Closed
  • New house · New building

    Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC and COA.

    Applied Mar 22, 2017 · issued Apr 12, 2017 · completed Apr 23, 2018 · 1 home added · Permit 17 132536 BLD

    Closed
  • Demolition

    Proposal to demolish existing 1 storey SFD. See BLD for new dwelling.

    Applied Mar 22, 2017 · issued Apr 12, 2017 · completed Jul 28, 2017 · 1 home removed · Permit 17 132555 DEM

    Closed
  • Drains and site services

    Drain - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC and COA.

    Applied Mar 22, 2017 · issued Apr 12, 2017 · completed Oct 23, 2017 · Permit 17 132536 DRN

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC and COA.

    Applied Mar 22, 2017 · issued Apr 13, 2017 · completed Apr 20, 2018 · Permit 17 132536 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey SFD with integral garage and finished basement. See ZZC and COA.

    Applied Mar 22, 2017 · issued Apr 12, 2017 · completed Apr 5, 2018 · Permit 17 132536 PLB

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached dwelling with an attached garage.

    Decision: Approved (hearing Jan 12, 2017)

    Filed Oct 6, 2016 · File A0794/16EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 30 Clissold Rd · Minor variance

    To construct a new duplex with an attached garage, and a new garden suite in the rear yard.

    230 m away · filed Sep 14, 2026 · Hearing scheduled

  • 1171 Islington Ave · Minor variance

    90 m away · filed Jun 30, 2026 · Accepted

  • 1171 Islington Ave · Consent

    90 m away · filed Jun 30, 2026 · Accepted

  • 1173 Islington Ave · Consent

    90 m away · filed Jun 30, 2026 · Accepted

  • 1171 Islington Ave · Minor variance

    90 m away · filed Jun 30, 2026 · Accepted

  • 1171 Islington Ave · Minor variance

    90 m away · filed Jun 30, 2026 · Accepted

  • 1205 Islington Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a two-storey rear and south side addition. The altered dwelling will contain a total of two residential units.

    210 m away · filed Jun 18, 2026 · Approved

  • 1199 Islington Ave · Consent

    To obtain consent to create a reciprocal easement / right-of-way for the purpose of maintenance and vehicular and pedestrian access

    180 m away · filed Aug 15, 2024 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.