Toronto address · Ward 14, Toronto-Danforth
167 Carlaw Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Party wall permit in conjunction with 165 Carlaw Ave. Permit #: 20 215628 BLD 00 SR
Applied Nov 20, 2020 · issued Nov 27, 2020 · completed May 29, 2026 · Permit 20 220835 BLD
- Closed
Heating and ventilation
Hvac - to re-construct 2 piece powder room due to asbestos contamination. New hvac forced air system, by others, new back-flow valve added
Applied Oct 4, 2016 · issued Oct 17, 2016 · completed Dec 31, 2025 · Permit 16 232450 HVA
- Closed
Plumbing
Plumbing - TO RE-CONSTRUCT 2 PIECE POWDER ROOM DUE TO ASBESTOS CONTAMINATION. NEW HVAC FORCED AIR SYSTEM, BY OTHERS, NEW BACK-FLOW VALVE ADDED
Applied Oct 4, 2016 · issued Oct 6, 2016 · completed Jun 19, 2025 · Permit 16 232450 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
9 storeys · 78 homes · Mixed use
110 m away · Site plan · Approved · filed May 3, 2023
- Approved
462 Eastern Avenue and 150 Logan Avenue
1 storeys · Residential
330 m away · Condominium · Approved · filed Oct 21, 2024
- Under appeal
Neighbours’ Committee of Adjustment files within 250 m
929 Queen St E · Minor variance
To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…
90 m away · filed Apr 15, 2026 · Approved
140 Carlaw Ave · Minor variance
To alter the existing two-storey townhouse by reconstructing and enclosing the existing front porch with stairs.
150 m away · filed Feb 24, 2026 · Application withdrawn
132 Morse St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a rooftop deck above.
200 m away · filed Oct 3, 2024 · Approved
972 Queen St E · Minor variance
To convert the existing three-storey mixed-use building (972 Queen Street East) (containing one commercial ground floor unit and one vacant residential unit on the second and third floors) and rear two-storey ancillary building (181A Carlaw Avenue) (containing one ground floor vacant commercial unit and one vacant residential unit on the second floor) into a commercial use. There will be no residential dwelling units on the lot and no parking spaces on-site provided.
110 m away · filed May 29, 2024 · Approved
25 Boston Ave · Minor variance
To legalize and to maintain the existing ancillary structure (carport) at the rear of the property, abutting the laneway.
220 m away · filed Nov 9, 2023 · Approved
29 Boston Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
210 m away · filed Sep 27, 2023 · Approved
1003 Queen St E · Minor variance
To permit the existing rear second storey balcony, which was constructed without an authorized building permit on the existing four-storey mixed-use building.
200 m away · filed Sep 7, 2023 · Approved
1001 Queen St E · Minor variance
To construct a six-storey mixed-use building comprising of 2 commercial units on the ground level (fronting Queen Street East) and a total of 28 residential units (1 unit on the ground level (fronting Pape Avenue), and the remaining 27 units on the second to sixth levels).
160 m away · filed May 6, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.