Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

167 Nairn Ave

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Interior renovation to convert single family dwelling to a single family home with secondary suite

    Applied Oct 10, 2024 · issued Nov 27, 2024 · completed Nov 20, 2025 · Permit 24 224711 HVA

    Closed
  • Plumbing

    Plumbing - Interior renovation to convert single family dwelling to a single family home with secondary suite

    Applied Oct 10, 2024 · issued Nov 27, 2024 · completed Nov 20, 2025 · Permit 24 224711 PLB

    Closed
  • Small residential project · Second suite (New)

    Interior renovation to convert single family dwelling to a single family home with secondary suite

    Applied Oct 10, 2024 · issued Nov 27, 2024 · completed Nov 20, 2025 · 1 home added · Permit 24 224711 BLD

    Closed
  • Drains and site services

    Drain - Interior renovation to convert single family dwelling to a single family home with secondary suite

    Applied Oct 10, 2024 · issued Nov 27, 2024 · completed Jan 22, 2025 · Permit 24 224711 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 188 Nairn Ave · Minor variance

    70 m away · filed May 12, 2026 · Postponed

  • 75 Harvie Ave · Minor variance

    To legalize and to maintain the existing rear one-storey addition (ground floor enclosure), which was constructed without an authorized building permit.

    240 m away · filed Mar 13, 2025 · Approved

  • 195 Nairn Ave · Minor variance

    To convert the existing one-storey detached dwelling (one unit) into a three-storey detached dwelling (duplex) by constructing a rear one-storey addition with a ground floor deck, and second and third storey additions. Also, to reconstruct the front porch, the front basement walk-out, and the rear one-storey ancillary building (detached garage, abutting the laneway). There will be a total of two residential dwelling units on this lot.

    70 m away · filed Feb 5, 2024 · Approved

  • 75 Harvie Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition that will be cantilevered beyond the existing ground floor level to provide a covered open space below.

    240 m away · filed Nov 13, 2023 · Approved

  • 142 Earlscourt Ave · Minor variance

    To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.

    110 m away · filed Jun 1, 2023 · Approved

  • 137 Morrison Ave · Minor variance

    To alter the existing two-storey detached dwelling by enclosing the existing front porch and to construct new front stairs.

    180 m away · filed Apr 18, 2023 · Approved

  • 205 Earlscourt Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey ground floor side (north) addition for an integral garage and a complete second storey addition.

    170 m away · filed Dec 12, 2022 · Approved

  • 170 Hope St · Minor variance

    To construct a two-storey ancillary building (garage with laneway suite) by adding a second storey addition above the existing rear detached garage, abutting the laneway.

    100 m away · filed Sep 15, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.