Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

168 Marion St

The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a 2 storey rear addition, interior alterations to the ground floor and a new deck at the rear of the existing single family dwelling. See also 18-145170 ZZC & A0522/18TEY

    Applied May 30, 2019 · issued Jun 6, 2019 · completed Dec 18, 2019 · Permit 19 127553 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct a 2 storey rear addition, interior alterations to the ground floor and a new deck at the rear of the existing single family dwelling. See also 18-145170 ZZC & A0522/18TEY

    Applied Mar 19, 2019 · issued Mar 28, 2019 · completed Oct 8, 2019 · Permit 19 127553 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct a 2 storey rear addition, interior alterations to the ground floor and a new deck at the rear of the existing single family dwelling. See also 18-145170 ZZC & A0522/18TEY

    Applied Mar 19, 2019 · issued Mar 28, 2019 · completed Apr 23, 2026 · Permit 19 127553 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter a two-storey detached single family dwelling. To demolish an existing one-storey rear addition and to construct a two-storey rear addition with deck.

    Decision: Approved (hearing Oct 24, 2018)

    Filed May 22, 2018 · File A0522/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 1605 Queen Street West

    Not stated in the file

    400 m away · Rezoning · Submitted · filed Apr 27, 2026

    Submitted

Neighbours’ Committee of Adjustment files within 250 m

  • 207 Pearson Ave · Minor variance

    To construct a new two-storey ancillary building (containing one parking space, one laneway suite, and a green roof) in the rear yard, abutting the laneway. There will be a total of four residential dwelling units on this lot (three dwelling units within the main house and one dwelling unit within the ancillary building).

    70 m away · filed Nov 21, 2024 · Withdrawn

  • 175 Galley Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition with a covered porch, a rear basement walkout, a rear two-storey addition with a ground floor deck and stairs, and a rear second storey balcony.

    170 m away · filed Nov 1, 2024 · Approved

  • 175 Pearson Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition (containing front and rear canopies, a rear integral garage and a below-grade basement and tunnel connecting to the main house) in the rear yard, abutting the laneway. The existing one-storey ancillary building (detached garage) will be demolished.

    200 m away · filed Jul 9, 2024 · Refused

  • 122 Marion St · Minor variance

    To convert the existing two-storey, two-unit detached dwelling with a secondary suite in the basement, into a single-family dwelling, by constructing a rear and partial side two-storey addition with a rear ground floor deck, and a second storey balcony. The existing garage in the rear yard will be maintained and unaltered.

    200 m away · filed Jun 29, 2024 · Approved

  • 210 Galley Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial rear one-storey addition.

    220 m away · filed Apr 16, 2024 · Approved

  • 133 Marion St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a new rear ground floor deck, as well as a patio, and a one-storey ancillary structure (shed), in the rear yard of the property. The existing rear detached garage will be demolished, and a new rear parking pad will be constructed.

    170 m away · filed Mar 26, 2024 · Approved

  • 133 Roncesvalles Ave · Minor variance

    To alter the existing three-storey mixed-use building (containing ground floor commercial space and two residential dwelling units on the second and third levels) by constructing a rear three-storey addition with a mezzanine level above the third storey and a rear (east) ground floor pedestrian access. This altered building will maintain commercial space on the ground floor and will provide a total of six residential dwelling units on the second and third levels.

    250 m away · filed Jan 25, 2024 · Approved

  • 70 Roncesvalles Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition and interior alterations to construct a total of 4 new dwelling units (fourplex). Also, to demolish the existing one-storey rear portion of the dwelling and construct a three-storey rear addition (with basement), rear balconies on the ground, second, and third floor levels, a third storey side (south) balcony, as well as side (south) access stairs to the basement level. The front second storey balcony will also be expanded.

    70 m away · filed Dec 13, 2023 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.