Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

169 Nairn Ave

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposed backwater valve installation

    Applied Feb 12, 2025 · issued Feb 12, 2025 · completed Mar 10, 2025 · Permit 25 116172 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 188 Nairn Ave · Minor variance

    70 m away · filed May 12, 2026 · Postponed

  • 195 Nairn Ave · Minor variance

    To convert the existing one-storey detached dwelling (one unit) into a three-storey detached dwelling (duplex) by constructing a rear one-storey addition with a ground floor deck, and second and third storey additions. Also, to reconstruct the front porch, the front basement walk-out, and the rear one-storey ancillary building (detached garage, abutting the laneway). There will be a total of two residential dwelling units on this lot.

    60 m away · filed Feb 5, 2024 · Approved

  • 142 Earlscourt Ave · Minor variance

    To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.

    120 m away · filed Jun 1, 2023 · Approved

  • 137 Morrison Ave · Minor variance

    To alter the existing two-storey detached dwelling by enclosing the existing front porch and to construct new front stairs.

    170 m away · filed Apr 18, 2023 · Approved

  • 205 Earlscourt Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a one-storey ground floor side (north) addition for an integral garage and a complete second storey addition.

    160 m away · filed Dec 12, 2022 · Approved

  • 170 Hope St · Minor variance

    To construct a two-storey ancillary building (garage with laneway suite) by adding a second storey addition above the existing rear detached garage, abutting the laneway.

    110 m away · filed Sep 15, 2022 · Approved

  • 149 Boon Ave · Minor variance

    To construct a two-storey laneway suite (with an integral garage) at the rear of the existing three-storey detached dwelling.

    240 m away · filed Aug 24, 2022 · Approved

  • 109 Morrison Ave · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a second storey addition, a new rear ground floor deck, and to alter the front porch roof.

    200 m away · filed Mar 29, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.