Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

17 Cronin Dr

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - proposal to construct a new two storey detached SFD with a finished basement, front porch, rear deck, rear basement walkout and an integral garage.

    Applied May 26, 2026 · issued Jun 30, 2026 · Permit 25 122094 HVA

    Permit issued
  • Plumbing

    Plumbing - proposal to construct a new two storey detached SFD with a finished basement, front porch, rear deck, rear basement walkout and an integral garage.

    Applied May 26, 2026 · issued May 26, 2026 · Permit 25 122094 PLB

    Inspections under way
  • Drains and site services

    Drain - proposal to construct a new two storey detached SFD with a finished basement, front porch, rear deck, rear basement walkout and an integral garage.

    Applied May 26, 2026 · issued May 26, 2026 · Permit 25 122094 DRN

    Inspections under way
  • New house · New building

    proposal to construct a new two storey detached SFD with a finished basement, front porch, rear deck, rear basement walkout and an integral garage.

    Applied Feb 26, 2025 · issued Apr 7, 2025 · 1 home added · Permit 25 122094 BLD

    Inspections under way
  • Demolition

    Proposal to demolish 2 storey home and replace with new 2 storey home

    Applied Feb 26, 2025 · issued Apr 7, 2025 · completed May 27, 2026 · 1 home removed · Permit 25 122117 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new detached dwelling with an attached garage.

    Decision: Approved (hearing Aug 17, 2023)

    Filed Mar 24, 2023 · File A0158/23EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 42 Blaketon Rd · Minor variance

    To construct a new three-storey rear addition and a third storey addition above the existing dwelling in order to permit a duplex.

    240 m away · filed Feb 10, 2025 · Approved

  • 25 Cronin Dr · Minor variance

    To a new one-storey addition above the existing dwelling and a new two storey rear and south side addition.

    60 m away · filed Sep 2, 2024 · Approved

  • 27 Cronin Dr · Minor variance

    To construct a new duplex.

    80 m away · filed Jun 15, 2023 · Approved

  • 27 Cronin Dr · Consent

    To obtain consent to sever the lot into two residential lots.

    80 m away · filed Jun 15, 2023 · Approved

  • 27 Cronin Dr · Minor variance

    To construct a new duplex.

    80 m away · filed Jun 15, 2023 · Approved

  • 3 Oregon Trl · Minor variance

    To construct a second storey addition above the exsiting dwelling, a new front porch, a new rear deck and a new attached garage.

    150 m away · filed Sep 3, 2021 · Approved

  • 7 Nipissing Dr · Minor variance

    To construct a two-storey north side addition which will contain an attached garage, a second storey addition over the existing dwelling, new covered front porch, a new rear deck and a rear yard basement walk-out.

    110 m away · filed Jun 10, 2021 · Approved

  • 83 Smithwood Dr · Minor variance

    To construct a second storey addition above the existing dwelling.

    240 m away · filed May 8, 2021 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.