Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

3 Oregon Trl

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct additions and alterations to the existing dwelling including a second storey addition and interior alterations

    Applied May 12, 2022 · issued May 25, 2022 · completed Mar 14, 2023 · Permit 22 118899 HVA

    Closed
  • Small residential project · Multiple projects

    Revision 01. Revision to exterior alavation veneer and additional of basement underpinningProposal to construct additions and alterations to the existing dwelling including a second storey addition and interior alterations

    Applied May 4, 2022 · issued Jul 12, 2022 · completed Mar 16, 2023 · Permit 22 118899 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - Proposal to construct additions and alterations to the existing dwelling including a second storey addition and interior alterations

    Applied Mar 2, 2022 · issued Mar 23, 2022 · completed Mar 15, 2023 · Permit 22 118899 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal to construct additions and alterations to the existing dwelling including a second storey addition and interior alterations

    Applied Mar 2, 2022 · issued Mar 23, 2022 · completed Mar 16, 2023 · Permit 22 118899 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a second storey addition above the exsiting dwelling, a new front porch, a new rear deck and a new attached garage.

    Decision: Approved (hearing Jan 13, 2022)

    Filed Sep 3, 2021 · File A0482/21EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Cronin Dr · Minor variance

    To a new one-storey addition above the existing dwelling and a new two storey rear and south side addition.

    200 m away · filed Sep 2, 2024 · Approved

  • 4014 Bloor St W · Minor variance

    To construct a second storey side addition, a one storey rear addition, a new front porch and a new rear yard deck.

    190 m away · filed Oct 20, 2023 · Approved

  • 27 Cronin Dr · Minor variance

    To construct a new duplex.

    230 m away · filed Jun 15, 2023 · Approved

  • 27 Cronin Dr · Consent

    To obtain consent to sever the lot into two residential lots.

    230 m away · filed Jun 15, 2023 · Approved

  • 27 Cronin Dr · Minor variance

    To construct a new duplex.

    230 m away · filed Jun 15, 2023 · Approved

  • 4010 Bloor St W · Minor variance

    To construct one-storey west and rear additions.

    190 m away · filed Jun 6, 2023 · Approved

  • 17 Cronin Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    150 m away · filed Mar 24, 2023 · Approved

  • 7 Nipissing Dr · Minor variance

    To construct a two-storey north side addition which will contain an attached garage, a second storey addition over the existing dwelling, new covered front porch, a new rear deck and a rear yard basement walk-out.

    100 m away · filed Jun 10, 2021 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.