Toronto address · Ward 3, Etobicoke-Lakeshore
17 Humber Ridge Dr
The City of Toronto has 4 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - proposal for front and rear extention and second storey addition. Includes front porch, rear deck and basement walkout.
Applied Mar 18, 2025 · issued Mar 28, 2025 · Permit 25 107938 HVA
- Inspections under way
Plumbing
Plumbing - proposal for front and rear extention and second storey addition. Includes front porch, rear deck and basement walkout.
Applied Jan 23, 2025 · issued Mar 24, 2025 · Permit 25 107938 PLB
- Inspections under way
Small residential project · Multiple projects
proposal for front and rear extention and second storey addition. Includes front porch, rear deck and basement walkout.
Applied Jan 23, 2025 · issued Mar 24, 2025 · Permit 25 107938 BLD
- Inspections under way
Drains and site services
Drain - proposal for front and rear extention and second storey addition. Includes front porch, rear deck and basement walkout.
Applied Jan 23, 2025 · issued Mar 24, 2025 · Permit 25 107938 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one-storey front and rear addition, a complete second storey addition, and a partial third-storey addition above the existing dwelling.
Decision: Approved (hearing Feb 8, 2024)
Filed Dec 4, 2023 · File A0494/23EYK
What’s planned nearby
Development sites within 500 m
- Under review
144-150 Berry Road and 1-25 Neighbourhood Lane
10 storeys · 234 homes · Residential
410 m away · Condominium · Under review · filed May 16, 2022
Neighbours’ Committee of Adjustment files within 250 m
57 Riverwood Pkwy · Minor variance
To construct a second storey addition above the existing dwelling and two-storey rear additions on the east and west side.
100 m away · filed Dec 23, 2021 · Approved
5 Humber Ridge Dr · Minor variance
To construct a second storey above the existing dwelling, a new front porch and new covered rear deck.
90 m away · filed Jul 5, 2021 · Approved
6 Hill Heights Rd · Minor variance
To convert the existing storage space in the basement into an additional dwelling unit and to convert a portion of the existing laundry room into amenity space.
140 m away · filed May 26, 2020 · Deferred
8 Kings Point Dr · Minor variance
To legalize and to maintain the creation of an additional dwelling unit located in the lower level. The building will contain a total of 17 dwelling units.
60 m away · filed Feb 20, 2020 · Approved
12 Humber Ridge Dr · Minor variance
To legalize and to maintain the existing detached dwelling with an attached garage. A previous Committee of Adjustment application (A0848/18EYK) approved variances relating to gross floor area, dwelling length, dwelling height, main pedestrian entrance height, soffit height and platforms at or above the second storey.
60 m away · filed Dec 27, 2019 · Approved
23 Ivy Lea Cres · Minor variance
To construct a second storey addition above the existing dwelling.
230 m away · filed Nov 4, 2019 · Approved
19 Humber Ridge Dr · Minor variance
To construct a new detached dwelling with an integral garage.
40 m away · filed Aug 21, 2019 · Approved
12 Humber Ridge Dr · Minor variance
To construct a new detached dwelling with an integral garage.
60 m away · filed Nov 20, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.