Toronto address · Ward 13, Toronto Centre
17 Pembroke St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Install Backflow Preventor Installation
Applied Oct 13, 2023 · issued Nov 8, 2023 · completed Aug 1, 2024 · Permit 23 214008 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
47 storeys · 619 homes · Residential
110 m away · Site plan · Under review · filed Sep 16, 2022
- Under review
40 storeys · 693 homes · Residential
120 m away · Site plan · Under review · filed Dec 30, 2024
- Under review
52 storeys · 630 homes · Mixed use
150 m away · Site plan · Under review · filed Mar 18, 2022
- Under review
212-218 Dundas Street East and 279 1/2 George Street
44 storeys · 542 homes · Mixed use
210 m away · Condominium · Under review · filed Oct 25, 2021
- Under review
32 storeys · 315 homes · Mixed use
220 m away · Rezoning · Under review · filed Mar 31, 2026
- Under appeal
225-229 Queen Street East and 120-134 Sherbourne Street
37 storeys · 450 homes · Mixed use
310 m away · Site plan · Under appeal · filed Nov 7, 2021
Neighbours’ Committee of Adjustment files within 250 m
212 Dundas St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
180 m away · filed Apr 30, 2026 · Approved
225 Jarvis St · Minor variance
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
190 m away · filed Mar 4, 2025 · Approved
291 George St · Minor variance
To alter the existing five-storey apartment building by converting one parking space (located on the B1 parking level) into a storage area use. There will be a total of 47 parking spaces on-site instead of 48 parking spaces.
240 m away · filed Jan 29, 2025 · Approved
203 Jarvis St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-way.
200 m away · filed Sep 17, 2024 · Approved
225 Jarvis St · Minor variance
To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.
190 m away · filed Jun 22, 2024 · Approved
150 Sherbourne St · Minor variance
To construct a new four-storey detached building (community recreation centre).
170 m away · filed Jun 6, 2024 · Approved
203 Jarvis St · Minor variance
To alter the development standards for the 32-storey mixed-use building (as approved under Site Specific Zoning By-law 683-2020(LPAT)) by reducing the width of the bicycle parking spaces.
200 m away · filed Oct 23, 2023 · Approved
310 Dundas St E · Minor variance
To alter the existing three-storey apartment building by constructing a three-storey rear addition in order to provide 11 one-bedroom units for seniors.
220 m away · filed Jul 5, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.