The City of Toronto has 14 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    REV 02: PROPOSED CHANGES TO STRUCTURAL AND ADDITION OF A SECONDARY SUITE.Rev 01:REVISION TO PERMIT FOR ADDITIONAL FLOOR Proposal to construct a new sfd-semi with finished basement.

    Applied Nov 1, 2022 · issued Nov 30, 2022 · completed Mar 13, 2024 · 1 home added · Permit 19 221998 BLD (revision 02)

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new sfd-semi with finished basement.

    Applied Sep 9, 2022 · issued Sep 13, 2022 · completed Dec 19, 2023 · Permit 19 221998 HVA

    Closed
  • Heating and ventilation

    Revision 01 - Proposed changes in all levels.HVAC - Proposal to construct a new rear laneway suite for new semi dwelling

    Applied Aug 3, 2022 · issued Aug 8, 2022 · completed Mar 14, 2024 · Permit 19 222009 HVA (revision 01)

    Closed
  • Small residential project · New laneway / rear yard suite

    REV 02 - Changes to rear yard landscaping.REV 01: changes as per drawings Proposal to construct a new rear laneway suite for new semi dwelling

    Applied May 14, 2021 · issued May 5, 2022 · completed Mar 20, 2024 · 1 home added · Permit 19 222009 BLD (revision 02)

    Closed
  • Plumbing

    Rev 01: REVISION TO PERMIT FOR ADDITIONAL FLOOR Plumbing - Proposal to construct a new sfd-semi with finished basement.

    Applied Sep 1, 2020 · issued Sep 9, 2020 · completed Dec 19, 2023 · Permit 19 221998 PLB (revision 01)

    Closed
  • New house · New building

    Rev 01:REVISION TO PERMIT FOR ADDITIONAL FLOOR Proposal to construct a new sfd-semi with finished basement.

    Applied Sep 1, 2020 · issued May 5, 2022 · completed Mar 13, 2024 · 1 home added · Permit 19 221998 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct a new rear laneway suite for new semi dwelling

    Applied Jun 30, 2020 · issued Jul 3, 2020 · completed Mar 14, 2024 · Permit 19 222009 HVA

    Closed
  • Small residential project · New laneway / rear yard suite

    REV01: changes as per drawings Proposal to construct a new rear laneway suite for new semi dwelling

    Applied Jun 11, 2020 · issued Jun 17, 2020 · completed Mar 20, 2024 · 1 home added · Permit 19 222009 BLD (revision 01)

    Closed
  • Demolition

    Proposal to demolish the existing 2 unit dwelling, sever the lot and construct 2 new single family dwellings with rear laneway suites.

    Applied Sep 26, 2019 · issued Dec 20, 2019 · completed Jan 5, 2024 · Permit 19 227480 DEM

    Closed
  • Small residential project · New laneway / rear yard suite

    Proposal to construct a new rear laneway suite for new semi dwelling

    Applied Sep 16, 2019 · issued Feb 7, 2020 · completed Mar 20, 2024 · 1 home added · Permit 19 222009 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new rear laneway suit for new semi dwelling

    Applied Sep 16, 2019 · issued Feb 7, 2020 · completed Dec 19, 2023 · Permit 19 222009 PLB

    Closed
  • New house · New building

    Proposal to construct a new sfd-semi with finished basement.

    Applied Sep 16, 2019 · issued Oct 30, 2019 · completed Mar 13, 2024 · 1 home added · Permit 19 221998 BLD

    Closed
Show 2 more permits
  • Plumbing

    Plumbing - Proposal to construct a new sfd-semi with finished basement.

    Applied Sep 16, 2019 · issued Feb 10, 2020 · completed Dec 19, 2023 · Permit 19 221998 PLB

    Closed
  • Drains and site services

    Drain - Proposal to construct a new sfd-semi with finished basement and rear laneway suit.

    Applied Sep 16, 2019 · issued Feb 10, 2020 · completed Mar 14, 2024 · Permit 19 221998 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new three-storey semi-detached dwelling. The existing rear ancillary building (laneway suite) is currently under construction by a separate building permit.

    Decision: Approved (hearing Dec 1, 2021)

    Filed Jun 1, 2021 · File A0742/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 656 St Clarens Ave · Minor variance

    To legalize and to maintain the conversion of the existing two-storey mixed-use building into a houseplex, without an authorized building permit. There is a total of five residential dwelling units on this lot.

    110 m away · filed Nov 14, 2025 · Approved

  • 172 Emerson Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition (removing the existing attic and dormers). The existing gutter at the third storey level will be maintained and unaltered. Also, to reconstruct the existing rear one-storey addition.

    10 m away · filed Jul 9, 2025 · Approved

  • 107 Lappin Ave · Minor variance

    To permit a portion of the existing one-storey ancillary building (detached garage in the rear yard, abutting the laneway) from the abutting westerly property, municipally known as 109 Lappin Avenue (as approved under Committee of Adjustment File A0465/24TEY), which encroaches onto this lot. Also, the existing garage height, gable roof, and eaves will be maintained and unaltered.

    110 m away · filed Jun 2, 2025 · Approved

  • 227 Emerson Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the existing one-storey portion of the dwelling).

    210 m away · filed May 1, 2025 · Approved

  • 98 Millicent St · Minor variance

    To legalize and to maintain the existing two-storey ancillary building (containing two laneway suites), abutting the laneway, which was constructed beyond the limits of the authorized building permit. The ground level garage within the ancillary building was converted into an additional residential dwelling unit. There will be a total of four residential dwelling units on this lot (two units within the main dwelling and two units within the ancillary building).

    170 m away · filed Jan 27, 2025 · Postponed

  • 136 Millicent St · Minor variance

    To construct a new three-storey semi-detached apartment building (multiplex containing six residential dwelling units) with front and rear balconies on the second and third storeys, two rooftop terraces (above the third storey), front and rear entrances on the ground floor, and front and rear basement walkouts.

    70 m away · filed Oct 2, 2024 · Approved

  • 710 Lansdowne Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    200 m away · filed Aug 1, 2024 · Approved

  • 710 Lansdowne Ave · Minor variance

    To construct a new four-storey semi-detached multiplex (containing five residential dwelling units) with front and rear balconies on the second, third, and fourth storeys, a front porch, a rear ground floor deck, and a rear basement walkout.

    200 m away · filed Aug 1, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.