Toronto address · Ward 3, Etobicoke-Lakeshore
170 The West Mall
The City of Toronto has 45 building permits since 2017 (27 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to renovate existing office at mezzanine
Applied May 4, 2026 · issued Jun 4, 2026 · Permit 26 154722 PLB
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations to renovate existing office at mezzanine
Applied May 4, 2026 · issued Jun 4, 2026 · Permit 26 154722 HVA
- Permit issued
Addition or alteration · Interior alterations
Proposal for interior alterations to renovate existing office at mezzanine
Applied May 4, 2026 · issued Jun 3, 2026 · Permit 26 154722 BLD
- Permit issued
Addition or alteration · Other
Selective demolition of exterior precast panels, installation of new structural lintels, and final installation of new high-performance windows for the existing warehouse building . Interior fit-out by separate permit.
Applied Mar 27, 2026 · issued Apr 27, 2026 · Permit 26 135632 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposed demolition of 2 interior non-loadbearing insulated metal panel freezer walls, 2 new openings in an existing wall with 2 new ramps leading to new openings, and installation of structural support at new openings.
Applied Aug 11, 2022 · issued Oct 12, 2022 · Permit 22 189183 BLD
- Revision issued
Plumbing
Rev 01 - Revision includes gatehouse buildingPlumbing - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.
Applied Oct 1, 2021 · issued Oct 14, 2021 · Permit 19 150926 PLB (revision 01)
- Closed
Designated structure · Sign building permit related
To erect and display two wall signs and a ground sign, all illuminated, displaying static copy at the 1st floor on the north and east elevations. Ground sign is along the easterly frontage.*****METRO*****
Applied Jul 27, 2021 · issued Sep 13, 2021 · completed Jan 10, 2022 · Permit 21 190482 DST
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Proposal to install 13 maglocks in an existing light industrial/warehouse - "Metro"
Applied May 10, 2021 · issued Sep 17, 2021 · Permit 21 152577 FSU
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations, installation of a free-standing rack storage system.
Applied Sep 29, 2020 · issued Nov 4, 2020 · Permit 20 200050 BLD
- Closed
Temporary structure · Certified tents
Proposal for the installation one 20m x 25m x4m tent (Cert. 14-219337) to be used as a temporary storage tent. Tent will be weighted down using concrete blocks and is to be installed from Tuesday Sept. 22nd 2020 to Dec. 22nd 2020
Applied Sep 21, 2020 · issued Nov 27, 2020 · completed Sep 4, 2025 · Permit 20 196478 TPS
- Permit issued
Fire and security upgrade · Sprinklers
Proposal for the modification of the sprinkler systems to suit new floor layout.
Applied Sep 11, 2020 · issued Oct 13, 2020 · Permit 20 192549 FSU
- Cancelled
Conditional permit · New building
Conditional Permit - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647
Applied Feb 12, 2020 · completed Jun 3, 2021 · Permit 19 150926 BLD
Show 33 more permits
- Inspections under way
Addition or alteration · Interior alterations
Proposal for the installation of free standing AS/RS racking for pallets, trays, and work platforms to warehouse.
Applied Feb 3, 2020 · issued Jun 3, 2020 · Permit 20 111404 BLD
- Closed
Conditional permit · Partial permit - structural framing
Conditional Permit - Part Permit - Conditional Permit for above grade structure inclusive of cladding and roofing elements necessary for enclosure of building Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647
Applied Nov 20, 2019 · issued Dec 16, 2019 · completed Jun 4, 2021 · Permit 19 150926 STR
- Closed
Conditional permit · Site service
Conditional Permit - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.
Applied Oct 21, 2019 · issued Nov 14, 2019 · completed Jun 11, 2021 · Permit 19 151005 STS
- Inspections under way
Drains and site services
Drain - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647
Applied Sep 30, 2019 · issued Oct 9, 2019 · Permit 19 150926 DRN
- Closed
Conditional permit · Partial permit - foundation
Conditional Permit - Part Permit - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647
Applied Sep 30, 2019 · issued Oct 9, 2019 · completed Dec 16, 2019 · Permit 19 150926 FND
- Inspections under way
Heating and ventilation
HVAC - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.
Applied May 8, 2019 · issued Jun 8, 2020 · Permit 19 150926 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.
Applied May 8, 2019 · issued Jun 1, 2020 · Permit 19 150926 PLB
- Closed
Addition or alteration · Interior alterations
Proposed installation of free-standing rack storage system.
Applied May 3, 2019 · issued Jun 19, 2019 · completed Nov 12, 2019 · Permit 19 148979 BLD
- Approved
Alternative solution
Determination of safe exiting times by calculating time to exit and time for smoke to descend to 2.5m above the highest floor level.See NB19-150926
Applied Dec 14, 2018 · completed Jan 2, 2020 · Permit 18 268647 ALT
- Approved
Alternative solution
Platform Composition used to be wood rather than non-combustable flooring for access platforms.
Applied Dec 14, 2018 · completed Jul 24, 2019 · Permit 18 268630 ALT
- Approved
Alternative solution
Provide hose connections only at the building exits.
Applied Dec 14, 2018 · completed Jan 2, 2020 · Permit 18 268635 ALT
- Approved
Alternative solution
Using an ESFR system that is flooded prior to activation of sprinklers. The system is controlled with two independant early smoke detection systems.
Applied Dec 14, 2018 · completed Jan 2, 2020 · Permit 18 268570 ALT
- Closed
Addition or alteration · Interior alterations
Proposal to construct interior alteration to seated area
Applied Sep 12, 2018 · issued Nov 1, 2018 · completed Feb 28, 2019 · Permit 18 224357 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct interior alteration to seated area
Applied Sep 12, 2018 · issued Nov 1, 2018 · completed Nov 28, 2018 · Permit 18 224357 HVA
- Closed
Plumbing
Plumbing - Proposal to construct interior alteration to seated area
Applied Sep 12, 2018 · issued Nov 1, 2018 · completed Nov 28, 2018 · Permit 18 224357 PLB
- Closed
Temporary structure · Certified tents
Installation of 1 certified tent 30'x40' (15-159498) - Staff temporary lunchroomInstallation date: Sept 10, 2018, Dismantle date: October 10, 2018
Applied Sep 4, 2018 · issued Sep 21, 2018 · completed Jan 8, 2019 · Permit 18 219447 TPS
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to offices in the distribution centre.
Applied Sep 25, 2017 · issued Oct 25, 2017 · completed Oct 24, 2018 · Permit 17 238440 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to offices in the distribution centre.
Applied Sep 25, 2017 · issued Nov 10, 2017 · completed Jan 3, 2018 · Permit 17 238440 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to offices in the distribution centre.
Applied Sep 25, 2017 · issued Nov 15, 2017 · completed Jan 3, 2018 · Permit 17 238440 HVA
- Revision issued
Fire and security upgrade · Electromagnetic locks
Install maglocks to ground floor and mezzanine
Applied Dec 20, 2013 · issued Jan 22, 2014 · Permit 12 284518 FSU (revision 01)
- Revision issued
Plumbing
REVISION #2 add and remove roof drains and office area layout changes.Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO"
Applied Jul 30, 2013 · issued Sep 11, 2013 · Permit 11 250284 PLB (revision 02)
- Revision issued
Addition or alteration · Multiple projects
REVISION #2 adding vestibules for the refrigeration penthouse on the roof, addition of a cool dock in the freezer and changes to the interior wall layout and extending the conopy.(Original Permit description is...Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical u…
Applied Jul 30, 2013 · issued Mar 3, 2014 · Permit 11 250284 BLD (revision 02)
- Revision issued
Plumbing
Plumbing revision 01: Revision to watermain risers and refrigeration rooms.( Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO")
Applied Dec 6, 2012 · issued Jan 16, 2013 · Permit 11 250284 PLB (revision 01)
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Install maglocks to ground floor and mezzanine
Applied Nov 26, 2012 · issued Dec 6, 2012 · Permit 12 284518 FSU
- Permit issued
Fire and security upgrade · Sprinklers
Installation of new sprinkler system to existing warehouse building.
Applied Nov 23, 2011 · issued Mar 1, 2019 · Permit 11 314598 FSU
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO".
Applied Aug 9, 2011 · issued Oct 11, 2011 · Permit 11 250284 PLB
- Inspections under way
Addition or alteration · Multiple projects
Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO".
Applied Aug 3, 2011 · issued Oct 11, 2011 · Permit 11 250284 BLD
- Closed
Heating and ventilation
HVAC - interior alterations to existing washroom on main floor
Applied Jan 13, 2010 · issued Feb 3, 2010 · completed Jul 29, 2026 · Permit 10 103587 HVA
- Closed
Addition or alteration · Interior alterations
interior alterations to existing washroom on main floor
Applied Jan 12, 2010 · issued Feb 3, 2010 · completed Feb 25, 2020 · Permit 10 103587 BLD
- Closed
Heating and ventilation
HVAC - Construction of new mezzanine addition to an existing warehouse facility. - Addition(s)
Applied Aug 12, 2004 · issued Apr 12, 2005 · completed Jul 29, 2026 · Permit 04 154992 HVA
- Inspections under way
Addition or alteration · Addition(s)
Construction of new mezzanine addition to an existing warehouse facility.
Applied Jul 9, 2004 · issued Apr 12, 2005 · Permit 04 154992 BLD
- Closed (dormant)
Heating and ventilation · Other
''a & p'' hvac to industrial building
Applied Aug 28, 1998 · issued Sep 17, 1998 · completed Jun 8, 2026 · Permit 98 083871 HVA
- Inspections under way
Addition or alteration · Interior alterations
''a & p'' interior & exterior alterations
Applied Aug 6, 1998 · issued Oct 7, 1998 · Permit 98 083650 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.