Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

170 The West Mall

The City of Toronto has 45 building permits since 2017 (27 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations to renovate existing office at mezzanine

    Applied May 4, 2026 · issued Jun 4, 2026 · Permit 26 154722 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for interior alterations to renovate existing office at mezzanine

    Applied May 4, 2026 · issued Jun 4, 2026 · Permit 26 154722 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to renovate existing office at mezzanine

    Applied May 4, 2026 · issued Jun 3, 2026 · Permit 26 154722 BLD

    Permit issued
  • Addition or alteration · Other

    Selective demolition of exterior precast panels, installation of new structural lintels, and final installation of new high-performance windows for the existing warehouse building . Interior fit-out by separate permit.

    Applied Mar 27, 2026 · issued Apr 27, 2026 · Permit 26 135632 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed demolition of 2 interior non-loadbearing insulated metal panel freezer walls, 2 new openings in an existing wall with 2 new ramps leading to new openings, and installation of structural support at new openings.

    Applied Aug 11, 2022 · issued Oct 12, 2022 · Permit 22 189183 BLD

    Permit issued
  • Plumbing

    Rev 01 - Revision includes gatehouse buildingPlumbing - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.

    Applied Oct 1, 2021 · issued Oct 14, 2021 · Permit 19 150926 PLB (revision 01)

    Revision issued
  • Designated structure · Sign building permit related

    To erect and display two wall signs and a ground sign, all illuminated, displaying static copy at the 1st floor on the north and east elevations. Ground sign is along the easterly frontage.*****METRO*****

    Applied Jul 27, 2021 · issued Sep 13, 2021 · completed Jan 10, 2022 · Permit 21 190482 DST

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 13 maglocks in an existing light industrial/warehouse - "Metro"

    Applied May 10, 2021 · issued Sep 17, 2021 · Permit 21 152577 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for interior alterations, installation of a free-standing rack storage system.

    Applied Sep 29, 2020 · issued Nov 4, 2020 · Permit 20 200050 BLD

    Inspections under way
  • Temporary structure · Certified tents

    Proposal for the installation one 20m x 25m x4m tent (Cert. 14-219337) to be used as a temporary storage tent. Tent will be weighted down using concrete blocks and is to be installed from Tuesday Sept. 22nd 2020 to Dec. 22nd 2020

    Applied Sep 21, 2020 · issued Nov 27, 2020 · completed Sep 4, 2025 · Permit 20 196478 TPS

    Closed
  • Fire and security upgrade · Sprinklers

    Proposal for the modification of the sprinkler systems to suit new floor layout.

    Applied Sep 11, 2020 · issued Oct 13, 2020 · Permit 20 192549 FSU

    Permit issued
  • Conditional permit · New building

    Conditional Permit - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647

    Applied Feb 12, 2020 · completed Jun 3, 2021 · Permit 19 150926 BLD

    Cancelled
Show 33 more permits
  • Addition or alteration · Interior alterations

    Proposal for the installation of free standing AS/RS racking for pallets, trays, and work platforms to warehouse.

    Applied Feb 3, 2020 · issued Jun 3, 2020 · Permit 20 111404 BLD

    Inspections under way
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - Conditional Permit for above grade structure inclusive of cladding and roofing elements necessary for enclosure of building Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647

    Applied Nov 20, 2019 · issued Dec 16, 2019 · completed Jun 4, 2021 · Permit 19 150926 STR

    Closed
  • Conditional permit · Site service

    Conditional Permit - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.

    Applied Oct 21, 2019 · issued Nov 14, 2019 · completed Jun 11, 2021 · Permit 19 151005 STS

    Closed
  • Drains and site services

    Drain - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647

    Applied Sep 30, 2019 · issued Oct 9, 2019 · Permit 19 150926 DRN

    Inspections under way
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.See AS 18-268647

    Applied Sep 30, 2019 · issued Oct 9, 2019 · completed Dec 16, 2019 · Permit 19 150926 FND

    Closed
  • Heating and ventilation

    HVAC - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.

    Applied May 8, 2019 · issued Jun 8, 2020 · Permit 19 150926 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal for the construction of a new frozen distribution centre with ancillary maintenance and office spaces, loading docks, and surface parking.

    Applied May 8, 2019 · issued Jun 1, 2020 · Permit 19 150926 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed installation of free-standing rack storage system.

    Applied May 3, 2019 · issued Jun 19, 2019 · completed Nov 12, 2019 · Permit 19 148979 BLD

    Closed
  • Alternative solution

    Determination of safe exiting times by calculating time to exit and time for smoke to descend to 2.5m above the highest floor level.See NB19-150926

    Applied Dec 14, 2018 · completed Jan 2, 2020 · Permit 18 268647 ALT

    Approved
  • Alternative solution

    Platform Composition used to be wood rather than non-combustable flooring for access platforms.

    Applied Dec 14, 2018 · completed Jul 24, 2019 · Permit 18 268630 ALT

    Approved
  • Alternative solution

    Provide hose connections only at the building exits.

    Applied Dec 14, 2018 · completed Jan 2, 2020 · Permit 18 268635 ALT

    Approved
  • Alternative solution

    Using an ESFR system that is flooded prior to activation of sprinklers. The system is controlled with two independant early smoke detection systems.

    Applied Dec 14, 2018 · completed Jan 2, 2020 · Permit 18 268570 ALT

    Approved
  • Addition or alteration · Interior alterations

    Proposal to construct interior alteration to seated area

    Applied Sep 12, 2018 · issued Nov 1, 2018 · completed Feb 28, 2019 · Permit 18 224357 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct interior alteration to seated area

    Applied Sep 12, 2018 · issued Nov 1, 2018 · completed Nov 28, 2018 · Permit 18 224357 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct interior alteration to seated area

    Applied Sep 12, 2018 · issued Nov 1, 2018 · completed Nov 28, 2018 · Permit 18 224357 PLB

    Closed
  • Temporary structure · Certified tents

    Installation of 1 certified tent 30'x40' (15-159498) - Staff temporary lunchroomInstallation date: Sept 10, 2018, Dismantle date: October 10, 2018

    Applied Sep 4, 2018 · issued Sep 21, 2018 · completed Jan 8, 2019 · Permit 18 219447 TPS

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to offices in the distribution centre.

    Applied Sep 25, 2017 · issued Oct 25, 2017 · completed Oct 24, 2018 · Permit 17 238440 BLD

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to offices in the distribution centre.

    Applied Sep 25, 2017 · issued Nov 10, 2017 · completed Jan 3, 2018 · Permit 17 238440 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to offices in the distribution centre.

    Applied Sep 25, 2017 · issued Nov 15, 2017 · completed Jan 3, 2018 · Permit 17 238440 HVA

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Install maglocks to ground floor and mezzanine

    Applied Dec 20, 2013 · issued Jan 22, 2014 · Permit 12 284518 FSU (revision 01)

    Revision issued
  • Plumbing

    REVISION #2 add and remove roof drains and office area layout changes.Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO"

    Applied Jul 30, 2013 · issued Sep 11, 2013 · Permit 11 250284 PLB (revision 02)

    Revision issued
  • Addition or alteration · Multiple projects

    REVISION #2 adding vestibules for the refrigeration penthouse on the roof, addition of a cool dock in the freezer and changes to the interior wall layout and extending the conopy.(Original Permit description is...Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical u…

    Applied Jul 30, 2013 · issued Mar 3, 2014 · Permit 11 250284 BLD (revision 02)

    Revision issued
  • Plumbing

    Plumbing revision 01: Revision to watermain risers and refrigeration rooms.( Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO")

    Applied Dec 6, 2012 · issued Jan 16, 2013 · Permit 11 250284 PLB (revision 01)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Install maglocks to ground floor and mezzanine

    Applied Nov 26, 2012 · issued Dec 6, 2012 · Permit 12 284518 FSU

    Inspections under way
  • Fire and security upgrade · Sprinklers

    Installation of new sprinkler system to existing warehouse building.

    Applied Nov 23, 2011 · issued Mar 1, 2019 · Permit 11 314598 FSU

    Permit issued
  • Plumbing

    Plumbing - Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO".

    Applied Aug 9, 2011 · issued Oct 11, 2011 · Permit 11 250284 PLB

    Inspections under way
  • Addition or alteration · Multiple projects

    Proposed interior alterations to detached guard house, office area, enlarge freezer warehouse area into dry warehouse area, enlarge ground floor and mezzanine area within freezer warehouse area for additional offices/change rooms and lunchroom, new (2) storey mechanical room addition, raise a portion of the existing roof within freezer warehouse to accommodate additional mechanical units and new sprinkler system throughout freezer warehouse area all to an existing (1) storey warehouse building "METRO".

    Applied Aug 3, 2011 · issued Oct 11, 2011 · Permit 11 250284 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - interior alterations to existing washroom on main floor

    Applied Jan 13, 2010 · issued Feb 3, 2010 · completed Jul 29, 2026 · Permit 10 103587 HVA

    Closed
  • Addition or alteration · Interior alterations

    interior alterations to existing washroom on main floor

    Applied Jan 12, 2010 · issued Feb 3, 2010 · completed Feb 25, 2020 · Permit 10 103587 BLD

    Closed
  • Heating and ventilation

    HVAC - Construction of new mezzanine addition to an existing warehouse facility. - Addition(s)

    Applied Aug 12, 2004 · issued Apr 12, 2005 · completed Jul 29, 2026 · Permit 04 154992 HVA

    Closed
  • Addition or alteration · Addition(s)

    Construction of new mezzanine addition to an existing warehouse facility.

    Applied Jul 9, 2004 · issued Apr 12, 2005 · Permit 04 154992 BLD

    Inspections under way
  • Heating and ventilation · Other

    ''a & p'' hvac to industrial building

    Applied Aug 28, 1998 · issued Sep 17, 1998 · completed Jun 8, 2026 · Permit 98 083871 HVA

    Closed (dormant)
  • Addition or alteration · Interior alterations

    ''a & p'' interior & exterior alterations

    Applied Aug 6, 1998 · issued Oct 7, 1998 · Permit 98 083650 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.