Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

172 Albertus Ave

The City of Toronto has 9 building permits since 2017 (6 still open) and 2 Committee of Adjustment files on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Revision 03 - retaining wall relocation in basement walk out Rev 02: Addition of 3rd floor within the attic spaceRev 01: Proposed increase to building height and wall height.Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Jul 27, 2026 · Permit 22 243024 BLD (revision 03)

    Examiner's notice sent
  • Heating and ventilation

    Revision 01. HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Mar 20, 2024 · issued Apr 3, 2024 · Permit 22 243024 HVA (revision 01)

    Revision issued
  • New house · New building

    Rev 02: Addition of 3rd floor within the attic spaceRev 01: Proposed increase to building height and wall height.Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Mar 11, 2024 · issued Apr 16, 2024 · 1 home added · Permit 22 243024 BLD (revision 02)

    Revision issued
  • New house · New building

    Rev 01: Proposed increase to building height and wall height.Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Oct 4, 2023 · issued Oct 20, 2023 · Permit 22 243024 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Aug 22, 2023 · issued Sep 6, 2023 · Permit 22 243024 HVA

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Dec 29, 2022 · issued Apr 24, 2023 · completed Jul 22, 2026 · Permit 22 243024 DRN

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Dec 29, 2022 · issued Apr 24, 2023 · completed Jul 22, 2026 · Permit 22 243024 PLB

    Closed
  • Demolition

    Proposal to demolish the existing 2 storey SFD-detached dwelling.

    Applied Dec 29, 2022 · issued Apr 24, 2023 · completed Jul 22, 2026 · 1 home removed · Permit 22 243015 DEM

    Closed
  • New house · New building

    Proposal to construct a new 2 storey SFD-detached dwelling with a finished basement.See also 22 243015 DEM, 21 205710 ZZC and 22 134213 TLAB.

    Applied Dec 29, 2022 · issued Apr 24, 2023 · 1 home added · Permit 22 243024 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    Proposal to construct a new dwelling.

    Decision: Refused (hearing Sep 28, 2023)

    Filed Jul 27, 2023 · File A0422/23NY

    Closed
  • Minor variance · New R building

    To construct a new dwelling. Please note this file was deferred on February 24th in order to include missed variance(s).

    Decision: Approved (hearing Mar 24, 2022)

    Filed Nov 9, 2021 · File A0870/21NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 220 Briar Hill Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey front addition and one-storey front addition to the existing ground floor together with a new front porch. Please note this application was previously deferred at the July 9, 2026 Committee of Adjustment Public Hearing.

    180 m away · filed May 22, 2026 · Deferred

  • 172 Briar Hill Ave · Minor variance

    To construct a new dwelling. Further to the previous Public Hearing Notice, an additional variance has been added that was inadvertently missed in conjunction with other revisions, as outlined below.

    100 m away · filed Dec 18, 2025 · Approved

  • 158 Albertus Ave · Minor variance

    To construct a 3rd storey front addition, a 2 storey rear addition, and rebuild the existing front porch.

    40 m away · filed Sep 11, 2025 · Approved

  • 57 Lytton Blvd · Minor variance

    Proposal to demolish existing single family dwelling and construct a new 4-unit multiplex building.

    240 m away · filed Apr 25, 2025 · Approved

  • 145 Rosewell Ave · Minor variance

    To construct a second storey addition to the rear of the existing dwelling.

    110 m away · filed Apr 1, 2025 · Approved

  • 151 St Clements Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing a basement addition underneath the existing rear deck. Cross-reference previous Minor Variance Application A0284/22NY.

    250 m away · filed Oct 28, 2024 · Approved on condition

  • 160 Albertus Ave · Minor variance

    To construct 2-storey rear addition to existing 2-storey detached dwelling and add new third floor.

    30 m away · filed Mar 13, 2024 · Approved

  • 83 Lytton Blvd · Minor variance

    Proposal to construct a new dwelling.

    180 m away · filed Oct 30, 2023 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.