Toronto address · Ward 9, Davenport
172 Hope St
The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed: Installation of a back water valve and inside drains sanitary piping
Applied Oct 25, 2018 · issued Oct 25, 2018 · completed Oct 30, 2018 · Permit 18 247732 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey detached house by constructing a third storey addition, a rear three-storey addition, front second and third storey box windows, a side third storey balcony, and a new wrap around front and side porch.
Decision: Approved (hearing Apr 27, 2022)
Filed Jan 12, 2022 · File A0055/22TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
188 Nairn Ave · Minor variance
120 m away · filed May 12, 2026 · Postponed
75 Harvie Ave · Minor variance
To legalize and to maintain the existing rear one-storey addition (ground floor enclosure), which was constructed without an authorized building permit.
180 m away · filed Mar 13, 2025 · Approved
195 Nairn Ave · Minor variance
To convert the existing one-storey detached dwelling (one unit) into a three-storey detached dwelling (duplex) by constructing a rear one-storey addition with a ground floor deck, and second and third storey additions. Also, to reconstruct the front porch, the front basement walk-out, and the rear one-storey ancillary building (detached garage, abutting the laneway). There will be a total of two residential dwelling units on this lot.
150 m away · filed Feb 5, 2024 · Approved
75 Harvie Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition that will be cantilevered beyond the existing ground floor level to provide a covered open space below.
180 m away · filed Nov 13, 2023 · Approved
142 Earlscourt Ave · Minor variance
To permit the existing one-and-one-half-storey ancillary structure (carport roof structure with storage space above) in the rear yard. The existing two-storey semi-detached dwelling will be maintained and unaltered.
180 m away · filed Jun 1, 2023 · Approved
170 Hope St · Minor variance
To construct a two-storey ancillary building (garage with laneway suite) by adding a second storey addition above the existing rear detached garage, abutting the laneway.
10 m away · filed Sep 15, 2022 · Approved
200 Harvie Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a wood landing.
60 m away · filed Mar 7, 2022 · Approved
170 Harvie Ave · Minor variance
To construct a new two-storey detached dwelling with a front porch, a rear deck and a rear basement walkout.
50 m away · filed Jan 23, 2022 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.