Toronto address · Ward 13, Toronto Centre
178 Jarvis St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Garage Repair/Reconstruction
Replacement of waterproofing membrane on the parking garage roof deck including removal of the existing pavers and pour a new concrete pad.
Applied Apr 12, 2023 · issued May 10, 2023 · completed Feb 14, 2024 · Permit 23 133013 BLD
- Closed
Fire and security upgrade · Fire alarm
Replace fire alarm panel and fire alarm mini horn in each suite.
Applied Oct 15, 2004 · issued Oct 22, 2004 · completed Sep 14, 2026 · Permit 04 182160 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
32 storeys · 315 homes · Mixed use
30 m away · Rezoning · Under review · filed Mar 31, 2026
- Under review
- Under review
212-218 Dundas Street East and 279 1/2 George Street
44 storeys · 542 homes · Mixed use
240 m away · Condominium · Under review · filed Oct 25, 2021
- Approved
53 storeys · 591 homes · Mixed use
240 m away · Site plan · Approved · filed Aug 31, 2021
- Under review
52 storeys · 630 homes · Mixed use
260 m away · Site plan · Under review · filed Mar 18, 2022
- Now selling
Neighbours’ Committee of Adjustment files within 250 m
212 Dundas St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
230 m away · filed Apr 30, 2026 · Approved
134 Jarvis St · Minor variance
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
170 m away · filed Sep 4, 2025 · Approved
53 Mutual St · Minor variance
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
60 m away · filed Jul 23, 2025 · Approved
225 Jarvis St · Minor variance
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
80 m away · filed Mar 4, 2025 · Approved
75 Mutual St · Minor variance
To alter the existing three-storey detached building by constructing a fourth storey addition, and a rear four-storey addition. This building will contain a total of 18 dwelling rooms (multi-tenant house).
60 m away · filed Dec 9, 2024 · Approved
203 Jarvis St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-way.
70 m away · filed Sep 17, 2024 · Approved
90 Queen St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
230 m away · filed Aug 19, 2024 · Approved
225 Jarvis St · Minor variance
To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.
80 m away · filed Jun 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.