Toronto address · Ward 3, Etobicoke-Lakeshore
18 Belvale Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision #01 - Changes to deck and canopy in the rear yard. Proposed two-storey south side addition, a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a new rear deck.
Applied May 27, 2019 · issued Jul 23, 2019 · completed Sep 29, 2019 · Permit 17 252397 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposed two-storey south side addition, a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a new rear deck.
Applied May 7, 2018 · issued May 18, 2018 · completed Sep 29, 2019 · Permit 17 252397 HVA
- Closed
Plumbing
Plumbing - Proposed two-storey south side addition, a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a new rear deck.
Applied Oct 24, 2017 · issued Dec 13, 2017 · completed Sep 29, 2019 · Permit 17 252397 PLB
- Closed
Small residential project · Multiple projects
Proposed two-storey south side addition, a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a new rear deck.
Applied Oct 24, 2017 · issued Dec 13, 2017 · completed Sep 29, 2019 · Permit 17 252397 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing dwelling by constructing the following: a two-storey south side addition, a two-storey rear addition, a second storey addition above the existing dwelling, a new front porch and a new rear deck.
Decision: Approved (hearing Sep 28, 2017)
Filed Jul 7, 2017 · File A0596/17EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
27 Belvale Ave · Minor variance
To construct a two storey rear and north side addition, a one storey south side addition and a one storey front addition. The existing wood shed in the rear yard will be demolished. A previous Committee of Adjustment Decision (A280/15EYK) approved variances related to gross floor area, length and depth.
70 m away · filed Apr 10, 2026 · Approved
59 Westrose Ave · Minor variance
To construct a new detached dwelling with an attached garage.
160 m away · filed Feb 4, 2026 · Approved
42 Highgate Rd · Minor variance
To construct a rear two-storey addition to the existing dwelling, a second storey addition above the existing attached garage, a covered front porch, and a covered deck in the rear yard.
170 m away · filed Jan 10, 2025 · Approved
17 Highgate Rd · Minor variance
To construct a new detached dwelling with an attached garage.
130 m away · filed Sep 30, 2024 · Approved
1 Westrose Ave · Minor variance
To construct a second storey rear addition.
110 m away · filed Apr 19, 2024 · Approved
36 Westrose Ave · Minor variance
To construct a second and third storey addition above the existing dwelling. A previous Committee of Adjustment decision (A0554/17EYK) approved variances relating to lot coverage, floor space index, gross floor area, front and side yard setbacks, height, and platform area.
80 m away · filed Feb 1, 2024 · Approved
16 Highgate Rd · Minor variance
To construct a two-storey rear addition, a one-storey front addition and a second storey south side addition.
90 m away · filed Jun 27, 2023 · Approved
43 Highgate Rd · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed Feb 15, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.