- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a backwater valve to existing SFD-Semi
Applied Apr 3, 2018 · issued Apr 3, 2018 · completed Apr 30, 2018 · Permit 18 137705 DRN
- Inspections under way
Heating and ventilation
HVAC - Interior alteration, basement underpinning.
Applied Dec 7, 2017 · issued Dec 18, 2017 · Permit 17 238188 HVA
- Inspections under way
Plumbing
Plumbing - Interior alteration, basement underpinning.
Applied Sep 25, 2017 · issued Oct 18, 2017 · Permit 17 238188 PLB
- Closed
Small residential project · Multiple projects
Interior alteration, basement underpinning.
Applied Sep 25, 2017 · issued Oct 18, 2017 · completed Nov 27, 2018 · Permit 17 238188 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
3 storeys · Residential
190 m away · Site plan · Under review · filed Dec 6, 2021
- Under review
35 storeys · 380 homes · Mixed use
390 m away · Site plan · Under review · filed Aug 23, 2022
- Approved
34 storeys · 440 homes · Mixed use
420 m away · Site plan · Approved · filed Apr 11, 2022
- Under review
28 storeys · 210 homes · Residential
450 m away · Condominium · Under review · filed Nov 1, 2021
- Approved
37 storeys · 355 homes · Mixed use
460 m away · Site plan · Approved · filed Sep 16, 2022
Neighbours’ Committee of Adjustment files within 250 m
569 Christie St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 1104-2023) for a 12-unit stacked-townhouse development which is currently being proposed for a new three-storey apartment building (16-unit stacked townhouse development) with an underground parking garage level, a rear exterior basement (underground garage) staircase with railings, ground level staircases and walkways on all sides of the building, rooftop terraces accessed by staircase enclosures with green roofs, as well as increasing the maximum gross floor area, reducing the required landscape areas, number…
190 m away · filed Jun 4, 2025 · Approved
62 Hocken Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial third storey addition with a rooftop deck (above the existing second storey), a front porch with stairs, and a rear two-storey addition with a ground floor deck and patio. The existing rear ground floor deck will be demolished.
190 m away · filed May 8, 2025 · Approved
90 Alcina Ave · Minor variance
To construct a one-storey ancillary building (two-car garage) at the rear of the existing two-and-one-half-storey semi-detached dwelling, abutting a laneway.
230 m away · filed Aug 29, 2024 · Approved
128 Ellsworth Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition.
100 m away · filed Aug 15, 2024 · Approved
95 Ellsworth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial rear one-storey addition with a ground floor deck.
100 m away · filed Jul 22, 2024 · Approved
92 Helena Ave · Minor variance
To construct a new one-storey ancillary building (shed), in the rear yard, abutting the laneway.
160 m away · filed Jan 9, 2024 · Approved
98 Alcina Ave · Minor variance
To construct a new three-storey detached dwelling with a front covered porch and a rear third storey deck. Also, to construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
220 m away · filed Jun 29, 2023 · Approved
63 Hocken Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear cantilevered second storey addition with a rear ground floor deck.
210 m away · filed Jun 26, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.