Toronto address · Ward 19, Beaches-East York
18 Maclean Ave
The City of Toronto has 5 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - To demolish existing dwelling and construct a new three storey semi-detached two unit with a a integral garage
Applied Mar 25, 2025 · issued Apr 3, 2025 · completed May 7, 2026 · Permit 24 211907 HVA
- Inspections under way
New house · New building
To demolish existing dwelling and construct a new three storey semi-detached two unit with a a integral garage
Applied Sep 12, 2024 · issued Oct 17, 2024 · 1 home added · Permit 24 211907 BLD
- Closed
Plumbing
Plumbing - To demolish existing dwelling and construct a new three storey semi-detached two unit with a a integral garage
Applied Sep 12, 2024 · issued Oct 17, 2024 · completed May 7, 2026 · Permit 24 211907 PLB
- Closed
Demolition
To demolish existing dwelling and construct a new three storey semi-detached two unit with a integral garage
Applied Sep 12, 2024 · issued Oct 17, 2024 · completed Dec 11, 2024 · 1 home removed · Permit 24 211913 DEM
- Closed
Drains and site services
Drain - To demolish existing dwelling and construct a new three storey semi-detached two unit with a a integral garage
Applied Sep 12, 2024 · issued Oct 17, 2024 · completed Jul 10, 2025 · Permit 24 211907 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new two-and-one-half-storey semi-detached duplex with a front covered porch, a front second storey terrace, a rear integral two-car garage with south side entrance, a rear first floor rooftop terrace with stairs over the garage, a rear second storey rooftop deck (on the roof of the first storey below), a south side entrance with deck with stairs, and a south side basement walkout.
Decision: Approved (hearing Jun 19, 2024)
Filed Apr 19, 2024 · File A0394/24TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
25 Selwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.
60 m away · filed Sep 1, 2026 · Postponed
34 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.
170 m away · filed Aug 25, 2025 · Approved
29 Maclean Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).
60 m away · filed Jul 30, 2025 · Approved
34 Fernwood Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
210 m away · filed Jul 28, 2025 · Approved
32 Fernwood Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
220 m away · filed Jul 28, 2025 · Approved
32 Fernwood Park Ave · Minor variance
To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy (to replace the lawfully existing front porch), and front and rear basement walkouts. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the…
220 m away · filed Jun 2, 2025 · Refused
34 Fernwood Park Ave · Minor variance
To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing an integral garage, a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy, and front and rear basement walkouts. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the second, third, and fourth levels).
210 m away · filed Jun 2, 2025 · Refused
84 Hubbard Blvd · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing an extension to the front covered porch with stairs. Also, to construct a new one-storey ancillary building (shed with a green roof) in the rear yard of the property.
30 m away · filed Mar 27, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.