Toronto address · Ward 3, Etobicoke-Lakeshore
18 Twelfth St
The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building
Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.
Applied May 15, 2025 · issued Jun 10, 2025 · 1 home added · Permit 25 160251 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.
Applied May 15, 2025 · issued Jun 10, 2025 · Permit 25 160251 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.
Applied May 15, 2025 · issued Jun 10, 2025 · Permit 25 160251 PLB
- Inspections under way
Drains and site services
Drain - Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.
Applied May 15, 2025 · issued Jun 10, 2025 · Permit 25 160251 DRN
- Closed
Demolition
Proposal to demolish existing dwelling and construct a new two storey detached dwelling.
Applied May 15, 2025 · issued Jun 10, 2025 · completed Sep 26, 2025 · 1 home removed · Permit 25 160265 DEM
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Consent · Sever lot
To obtain consent to sever the lot for the purpose of a lot addition. A total of three residential lots will be created in conjunction with Application number B0032/22EYK.
Decision: Approved (hearing Feb 9, 2023)
Filed Jun 17, 2022 · 3 new lots · File B0029/22EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
46 Tenth St · Minor variance
To maintain the existing front porch that is currently uncer construction.
220 m away · filed Sep 26, 2025 · Approved
36 Eleventh St · Minor variance
To construct a new semi-detached garage in the rear yard.
120 m away · filed Sep 3, 2025 · Approved
69 Twelfth St · Minor variance
To construct a new detached dwelling with an attached garage.
220 m away · filed Mar 26, 2024 · Approved
52 Thirteenth St · Minor variance
To construct a new triplex.
160 m away · filed Feb 15, 2024 · Approved
46 Tenth St · Minor variance
To construct a second storey addition above the existing dwelling and to legalize and to maintain a detached garage in the rear yard currently under construction.
220 m away · filed Nov 6, 2023 · Approved
33 Twelfth St · Minor variance
To construct a new detached dwelling with an attached garage.
60 m away · filed Jun 13, 2023 · Approved
42 Thirteenth St · Minor variance
To construct a two-storey rear addition, a second storey over the existing dwelling and a new rear yard deck.
130 m away · filed May 17, 2023 · Approved
39 Thirteenth St · Minor variance
To construct a one-storey rear addition, a one-storey front addition and a second storey addition above the existing dwelling.
100 m away · filed Feb 9, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.