Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

18 Twelfth St

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.

    Applied May 15, 2025 · issued Jun 10, 2025 · 1 home added · Permit 25 160251 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.

    Applied May 15, 2025 · issued Jun 10, 2025 · Permit 25 160251 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.

    Applied May 15, 2025 · issued Jun 10, 2025 · Permit 25 160251 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a new two storey detached dwelling complete with a rear yard deck, basement walkout.

    Applied May 15, 2025 · issued Jun 10, 2025 · Permit 25 160251 DRN

    Inspections under way
  • Demolition

    Proposal to demolish existing dwelling and construct a new two storey detached dwelling.

    Applied May 15, 2025 · issued Jun 10, 2025 · completed Sep 26, 2025 · 1 home removed · Permit 25 160265 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Sever lot

    To obtain consent to sever the lot for the purpose of a lot addition. A total of three residential lots will be created in conjunction with Application number B0032/22EYK.

    Decision: Approved (hearing Feb 9, 2023)

    Filed Jun 17, 2022 · 3 new lots · File B0029/22EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 46 Tenth St · Minor variance

    To maintain the existing front porch that is currently uncer construction.

    220 m away · filed Sep 26, 2025 · Approved

  • 36 Eleventh St · Minor variance

    To construct a new semi-detached garage in the rear yard.

    120 m away · filed Sep 3, 2025 · Approved

  • 69 Twelfth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Mar 26, 2024 · Approved

  • 52 Thirteenth St · Minor variance

    To construct a new triplex.

    160 m away · filed Feb 15, 2024 · Approved

  • 46 Tenth St · Minor variance

    To construct a second storey addition above the existing dwelling and to legalize and to maintain a detached garage in the rear yard currently under construction.

    220 m away · filed Nov 6, 2023 · Approved

  • 33 Twelfth St · Minor variance

    To construct a new detached dwelling with an attached garage.

    60 m away · filed Jun 13, 2023 · Approved

  • 42 Thirteenth St · Minor variance

    To construct a two-storey rear addition, a second storey over the existing dwelling and a new rear yard deck.

    130 m away · filed May 17, 2023 · Approved

  • 39 Thirteenth St · Minor variance

    To construct a one-storey rear addition, a one-storey front addition and a second storey addition above the existing dwelling.

    100 m away · filed Feb 9, 2023 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.