Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

184 Heward Ave

The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Enlarge existing third floor roof dormer, new third floor rear deck, interior alterations to bathroom on second floor, new ground floor washroom and alterations to existing interior stairs

    Applied Mar 28, 2024 · issued Jul 15, 2024 · Permit 24 130644 BLD

    Inspections under way
  • Plumbing

    Plumbing - Enlarge existing third floor roof dormer, new third floor rear deck, interior alterations to bathroom on second floor, new ground floor washroom and alterations to existing interior stairs

    Applied Mar 28, 2024 · issued Jul 15, 2024 · completed Mar 10, 2025 · Permit 24 130644 PLB

    Closed
  • Small residential project · Other

    Administrative permit for 186 Heward underpinning.

    Applied Apr 9, 2010 · issued Apr 16, 2010 · completed Aug 20, 2025 · Permit 10 149265 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 929 Queen St E · Minor variance

    To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…

    140 m away · filed Apr 15, 2026 · Approved

  • 140 Carlaw Ave · Minor variance

    To alter the existing two-storey townhouse by reconstructing and enclosing the existing front porch with stairs.

    160 m away · filed Feb 24, 2026 · Application withdrawn

  • 132 Morse St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a rooftop deck above.

    230 m away · filed Oct 3, 2024 · Approved

  • 972 Queen St E · Minor variance

    To convert the existing three-storey mixed-use building (972 Queen Street East) (containing one commercial ground floor unit and one vacant residential unit on the second and third floors) and rear two-storey ancillary building (181A Carlaw Avenue) (containing one ground floor vacant commercial unit and one vacant residential unit on the second floor) into a commercial use. There will be no residential dwelling units on the lot and no parking spaces on-site provided.

    140 m away · filed May 29, 2024 · Approved

  • 25 Boston Ave · Minor variance

    To legalize and to maintain the existing ancillary structure (carport) at the rear of the property, abutting the laneway.

    210 m away · filed Nov 9, 2023 · Approved

  • 29 Boston Ave · Minor variance

    To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.

    210 m away · filed Sep 27, 2023 · Approved

  • 1003 Queen St E · Minor variance

    To permit the existing rear second storey balcony, which was constructed without an authorized building permit on the existing four-storey mixed-use building.

    160 m away · filed Sep 7, 2023 · Approved

  • 42 Winnifred Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a second storey rear addition with a front balcony, and a third storey addition with a rear balcony, as well as to enlarge the rear deck and to enclose the front porch.

    240 m away · filed May 11, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.