Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

186 Schell Ave

The City of Toronto has 3 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, a new 2nd floor addition, interior alterations, new front porch and a rear deck.See also 20 179213 ZZC and 20 216767 MV.

    Applied May 10, 2021 · issued Mar 11, 2022 · Permit 21 152551 BLD

    Permit issued
  • Plumbing

    Plumbing - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, a new 2nd floor addition, interior alterations, new front porch and a rear deck.See also 20 179213 ZZC and 20 216767 MV.

    Applied May 10, 2021 · issued Mar 11, 2022 · Permit 21 152551 PLB

    Revocation pending
  • Drains and site services

    Drain - Proposal for multiple projects to an existing 1 storey SFD-detached dwelling. Scope of work includes a 1 storey rear addition, a new 2nd floor addition, interior alterations, new front porch and a rear deck.See also 20 179213 ZZC and 20 216767 MV.

    Applied May 10, 2021 · issued Mar 11, 2022 · Permit 21 152551 DRN

    Revocation pending

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey rear addition and a second floor over the existing dwelling. Also to construct a new verandah.

    Decision: Approved (hearing Feb 25, 2021)

    Filed Nov 9, 2020 · File A0592/20NY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 61 Ronald Ave · Minor variance

    To construct a new three-storey fourplex with a garden suite in the rear yard of the property.

    240 m away · filed Jul 3, 2026 · Approved

  • 43 Little Blvd · Minor variance

    To permit the extension of the roof and eaves over the existing front porch.

    170 m away · filed Oct 28, 2025 · Approved

  • 95 Snider Ave · Minor variance

    To permit secondary parking and reduced landscaping in the front yard.

    60 m away · filed Jan 22, 2025 · Approved

  • 51 Little Blvd · Minor variance

    To construct a garden suite by adding a two storey side addition, and a second storey over the existing rear detached garage. Please note,The application was deferred on March 6, 2025, to allow the applicant to make modifications and receive revised zoning review.

    150 m away · filed Dec 12, 2024 · Approved

  • 51 Montcalm Ave · Minor variance

    Proposal to build a new 3 storey detached dwelling with an attached garage

    120 m away · filed Apr 17, 2023 · Approved

  • 140 Bowie Ave · Minor variance

    Proposal to construct a two storey rear addition, a second storey addition, a new integrated garage, a new front porch, and a new rear deck to existing dwelling.

    240 m away · filed Oct 25, 2022 · Approved

  • 43 Little Blvd · Minor variance

    Proposal to construct an uncovered porch with root cellar at the front of existing dwelling.

    170 m away · filed Aug 9, 2022 · Approved

  • 41 Snider Ave · Minor variance

    Proposal to construct a 2 storey rear addition, as well as add a second floor addition above existing dwelling with interior alterations to add an integral garage. Proposal includes front and rear deck and second suite in basement.

    250 m away · filed Jan 27, 2022 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.