Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

187 Berry Rd

The City of Toronto has 4 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal to convert existing locker room and laundry room into one bedroom suite, and a 1- bachelor suite, new laundry room and electrical rooms

    Applied Nov 30, 2018 · issued Feb 13, 2020 · 2 homes added · Permit 18 262993 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to convert existing locker room and laundry room into one bedroom suite, and a 1- bachelor suite, new laundry room and electrical rooms

    Applied Nov 30, 2018 · issued Feb 18, 2020 · completed Aug 13, 2026 · Permit 18 262993 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to convert existing locker room and laundry room into one bedroom suite, and a 1- bachelor suite, new laundry room and electrical rooms

    Applied Nov 30, 2018 · issued Sep 14, 2020 · completed Jul 16, 2026 · Permit 18 262993 PLB

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a 2 inch backflow prevention device.

    Applied May 30, 2018 · issued Jun 6, 2018 · completed Jul 14, 2025 · Permit 18 168611 PSA

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To create two additional dwelling units within the existing building. A total of 31 dwelling units are being proposed.

    Decision: Approved (hearing Jun 21, 2018)

    Filed May 31, 2017 · File A0482/17EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 301 Park Lawn Rd · Minor variance

    To alter the existing building by converting a portion of the existing indoor parking space and indoor amenity space into 2 additional dwelling units. The existing six-storey apartment building will contain a total of 41 dwelling units.

    120 m away · filed Apr 17, 2025 · Approved

  • 180 Berry Rd · Minor variance

    To construct a one-storey rear addition (sunroom).

    110 m away · filed Oct 2, 2024 · Approved

  • 200 Berry Rd · Minor variance

    To construct a new fourplex.

    230 m away · filed Jun 13, 2024 · Refused

  • 3 Glenn Murray Dr · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Nov 30, 2023 · Approved

  • 301 Park Lawn Rd · Minor variance

    To construct a front vesibule along the west side of the property. A previous Committee of Adjustment application (A0866/18EYK) approved a two-storey addition and additional dwelling units and variances relating to side yard setback, rear yard setback, distance between main walls, parking, accessible parking and side yard setback for an ancillary structure.

    120 m away · filed Dec 11, 2019 · Approved

  • 190 Berry Rd · Minor variance

    160 m away · filed Nov 21, 2019 · Application withdrawn

  • 190 Berry Rd · Minor variance

    To construct a covered deck in the rear yard. A previous Committee of Adjustment application (A0220/17EYK) approved variances relating to lot coverage, gross floor area, front yard setback, flat roof height parking space length and width.

    160 m away · filed Apr 4, 2019 · Approved

  • 320 Park Lawn Rd · Minor variance

    To permit a new driveway.

    90 m away · filed Feb 9, 2019 · Refused

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.