Toronto address · Ward 3, Etobicoke-Lakeshore
19 Burlington St
The City of Toronto has 6 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Other
Proposal to install solar panels on the roof top of an existing detached dwelling.
Applied Mar 25, 2024 · issued Apr 4, 2024 · Permit 24 129076 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct a new 3 storey duplex and demolish existing 3 storey single family dwelling
Applied Aug 12, 2021 · issued Apr 20, 2022 · completed Sep 25, 2024 · Permit 21 197261 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a new 3 storey duplex and demolish existing 3 storey single family dwelling
Applied Aug 12, 2021 · issued Apr 20, 2022 · completed Sep 25, 2024 · Permit 21 197261 PLB
- Closed
New house · New building
Proposal to construct a new 3 storey duplex
Applied Aug 12, 2021 · issued Apr 20, 2022 · completed Sep 25, 2024 · 2 homes added · Permit 21 197261 BLD
- Closed
Demolition
Proposal to demolish existing 3 storey single family dwelling to construct a new 3 storey duplex
Applied Aug 12, 2021 · issued Apr 20, 2022 · completed Jul 29, 2022 · 1 home removed · Permit 21 197297 DEM
- Closed
Drains and site services
Drain - Proposal to construct a new 3 storey duplex and demolish existing 3 storey single family dwelling
Applied Aug 12, 2021 · issued Apr 20, 2022 · completed Sep 16, 2024 · Permit 21 197261 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new duplex.
Decision: Approved (hearing Aug 1, 2019)
Filed Jun 21, 2019 · File A0344/19EYK
What’s planned nearby
Development sites within 500 m
- Under appeal
2405-2417 Lake Shore Boulevard West
557 homes · Residential
420 m away · Subdivision · Under appeal · filed Nov 9, 2021
- Under review
2256 Lake Shore Boulevard West
18 storeys · 594 homes · Mixed use
440 m away · Site plan · Under review · filed Sep 7, 2022
- Under review
54 storeys · 2,631 homes · Mixed use
500 m away · Rezoning · Under review · filed Jun 26, 2026
Neighbours’ Committee of Adjustment files within 250 m
47 Victoria St · Minor variance
To construct a second storey addition above the existing dwelling and to create a new dwelling unit in the basement. The altered dwelling will be a duplex.
90 m away · filed Apr 4, 2025 · Deferred
21 Louisa St · Minor variance
To construct a third floor addition in order to accommodate four additional dwelling units that will create a total of 10 dwelling units within the existing building.
190 m away · filed Jan 25, 2024 · Approved
24 Stanley Ave · Minor variance
To construct a rear sun room addition.
110 m away · filed Sep 6, 2023 · Approved
2300 Lake Shore Blvd W · Minor variance
To permit a temporary vehicle parking lot. A previous Committee of Adjustment application (A0518/17EYK) approved a variance related to permitting a vehicle parking lot.
130 m away · filed Jun 17, 2022 · Approved
20 Louisa St · Minor variance
To construct a third floor addition. The existing residential unit in the basement will be relocated to the proposed third floor. The existing six residential units will be maintained.
150 m away · filed Aug 19, 2020 · Approved
2308 Lake Shore Blvd W · Minor variance
To construct a south-side addition to the existing one-storey building.
80 m away · filed May 10, 2018 · Approved
2300 Lake Shore Blvd W · Minor variance
To permit a temporary vehicle parking lot.
130 m away · filed Jun 8, 2017 · Approved
19 Louisa St · Minor variance
To construct a third-storey addition above the existing building.
190 m away · filed Mar 24, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.