Toronto address · Ward 3, Etobicoke-Lakeshore
19 Skelton St
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve
Applied Jul 31, 2024 · issued Aug 1, 2024 · completed Aug 6, 2024 · Permit 24 191267 DRN
- Closed
Small residential project · Interior alterations
One new window north elevation in basement one new window east elevation in basement
Applied Feb 12, 2023 · issued Mar 6, 2023 · completed Aug 31, 2023 · Permit 23 113079 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations in the single family dwelling
Applied Oct 9, 2019 · issued Oct 25, 2019 · completed Aug 5, 2020 · Permit 19 234152 HVA
- Closed
Plumbing
Plumbing - Proposed interior alterations in the single family dwelling
Applied Oct 9, 2019 · issued Oct 21, 2019 · completed Aug 17, 2020 · Permit 19 234152 PLB
- Closed
Small residential project · Interior alterations
Proposed interior alterations in the single family dwelling
Applied Oct 9, 2019 · issued Oct 21, 2019 · completed Aug 5, 2020 · Permit 19 234152 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
54 storeys · 2,631 homes · Mixed use
310 m away · Rezoning · Under review · filed Jun 26, 2026
- Under review
29-71 Portland Street, 2-10 Audley Street and 8 Newcastle Street
27 storeys · 1,058 homes · Mixed use
330 m away · Site plan · Under review · filed Jul 5, 2024
- Under review
25 storeys · 479 homes · Mixed use
390 m away · Site plan · Under review · filed Nov 5, 2021
- Under review
37 storeys · 327 homes · Residential
460 m away · Condominium · Under review · filed Oct 21, 2021
- Under review
2256 Lake Shore Boulevard West
18 storeys · 594 homes · Mixed use
470 m away · Site plan · Under review · filed Sep 7, 2022
Neighbours’ Committee of Adjustment files within 250 m
47 Victoria St · Minor variance
To construct a second storey addition above the existing dwelling and to create a new dwelling unit in the basement. The altered dwelling will be a duplex.
180 m away · filed Apr 4, 2025 · Deferred
21 Louisa St · Minor variance
To construct a third floor addition in order to accommodate four additional dwelling units that will create a total of 10 dwelling units within the existing building.
230 m away · filed Jan 25, 2024 · Approved
83 Albert Ave · Minor variance
To construct a third floor addition in order to accommodate two additional dwelling units that will create a total of 8 dwelling units within the existing dwelling.
170 m away · filed May 5, 2023 · Deferred
20 Louisa St · Minor variance
To construct a third floor addition. The existing residential unit in the basement will be relocated to the proposed third floor. The existing six residential units will be maintained.
240 m away · filed Aug 19, 2020 · Approved
88 Burlington St · Minor variance
To construct a new detached dwelling with an attached garage.
120 m away · filed May 15, 2019 · Approved
88 Burlington St · Minor variance
To construct a new detached dwelling with an integral garage.
120 m away · filed Nov 14, 2018 · Refused
86 Burlington St · Minor variance
To construct a third storey addition above the existing dwelling and a secondary suite in the basement.
120 m away · filed Jan 15, 2018 · Approved
24 Portland St · Minor variance
To construct a new two-storey detached dwelling with a rear basement walkout and a detached garage in the rear yard.
230 m away · filed Dec 29, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.