Toronto address · Ward 10, Spadina-Fort York
1A Givins St
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed (dormant)
Plumbing · Unknown
Install fixtures in dwelling portion: 2nd floor: 1 b.t, 1 w.c, 1 w.b., 1 kitchen sink 3rd floor: 1 b.t., 1 w.c., 1 w.b., 1 kitchen sink cost incl. 393674 /lm
Applied Dec 20, 1996 · issued Nov 4, 1997 · completed Jun 8, 2026 · Permit 96 024243 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
10 storeys · 74 homes · Residential
500 m away · Site plan · Under review · filed Apr 1, 2026
- Under review
17 storeys · 227 homes · Mixed use
500 m away · Site plan · Under review · filed Sep 8, 2022
Neighbours’ Committee of Adjustment files within 250 m
155 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the one-storey addition), and a partial third storey addition with a rear balcony.
120 m away · filed Feb 20, 2026 · Approved
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition and to construct a new laneway suite (second floor) above existing garage in the rear yard.
110 m away · filed Jun 6, 2025 · Application withdrawn
119 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey cantilevered addition. Also, to alter the existing rear one-storey ancillary building (garage) by constructing a new cantilevered second storey laneway suite addition. There will be a total of two residential dwelling units (one unit occupying the main dwelling and one unit occupying the laneway suite).
110 m away · filed Jun 6, 2025 · Approved
26 Ossington Ave · Minor variance
To construct a new four-storey mixed-use building containing five residential dwelling units, and one commercial unit (to be located on the ground floor). There will be front and rear patios (above portions of the third storey).
160 m away · filed Nov 19, 2024 · Approved
112 Shaw St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, front and rear rooftop patios (above the third floor addition) with an enclosed rooftop access staircase, a rear basement addition, and a rear ground floor deck (above the rear basement addition).
60 m away · filed Aug 7, 2024 · Approved
3 Rebecca St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a front balcony.
60 m away · filed Jun 29, 2024 · Approved
169 Shaw St · Minor variance
To construct a new two-storey ancillary building (containing an extension of the existing residential care facility), and a new one-storey ancillary building (storage shed) in the rear yard of the existing three-storey residential care facility. The two detached garages in the rear yard will be demolished.
160 m away · filed Sep 28, 2023 · Approved
108 Crawford St · Minor variance
To construct a two-storey ancillary building (detached garage with laneway suite) in the rear yard, abutting Logie Place and a rear laneway. The second storey will be cantilevered on the rear (west) side of the ancillary building and the parking space will be accessed from Logie Place. The existing rear one-storey detached garage will be demolished.
160 m away · filed Sep 26, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.