Toronto address · Ward 15, Don Valley West
2 Chedington Pl
The City of Toronto has 5 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Under review
Heating and ventilation · Alter: add on /Ductwork
Proposed heat pump replacement and duct work adjustment
Applied May 25, 2026 · Permit 26 166612 MSA
- Inspections under way
Fire and security upgrade · Sprinklers
add fire supression sprinklers to lobby
Applied Sep 13, 2022 · issued Oct 19, 2022 · Permit 22 203069 FSU
- Closed
Addition or alteration · Interior alterations
proposal to change location of work in existing appartment
Applied Nov 15, 2021 · issued Dec 6, 2021 · completed Oct 19, 2022 · Permit 21 186986 BLD (revision 01)
- Closed
Fire and security upgrade · Fire alarm
Replacement of fire alarm control panel, all wiring and zoning to remain the same
Applied Sep 24, 2021 · issued Nov 5, 2021 · completed Apr 30, 2026 · Permit 21 217296 FSU
- Closed
Addition or alteration · Interior alterations
Proposal to remove an 2530 mm by 3400 mm section of concrete wall and replacement with structural steel moment-resisting frame.
Applied Jul 20, 2021 · issued Sep 20, 2021 · completed Oct 19, 2022 · Permit 21 186986 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
51 Bayview Wood · Consent
220 m away · filed Jan 11, 2024 · Accepted
318 Lawrence Ave E · Minor variance
To construct a new 3 storey performance hall addition to the existing school campus. Property includes 306-318 and 296 Lawrence Ave E and 101Mildenhall Rd. Please note, the application was deferred on February 1, 2024, to allow applicant to confirm zoning.
160 m away · filed Dec 8, 2023 · Approved
1 Wood Ave · Minor variance
Proposal to construct a new dwelling.
240 m away · filed Jun 16, 2023 · Approved
50 Bayview Wood · Consent
Proposal to obtain consent to sever the property into two residential lots. File numbers B0048/22NY, A0760/22NY, A0761/22NY will be jointly considered.
220 m away · filed Nov 22, 2022 · Approved
50 Bayview Wood · Minor variance
Proposal to construct a new dwelling. File numbers B0048/22NY, A0760/22NY, A0761/22NY will be jointly considered.
220 m away · filed Nov 22, 2022 · Approved
50 Bayview Wood · Minor variance
Proposal to construct a new detached single family dwelling. File numbers B0048/22NY, A0760/22NY, A0761/22NY will be jointly considered.
220 m away · filed Nov 22, 2022 · Approved
51 Bayview Wood · Consent
The obtain consent to sever the property into two residential lots. There were previous consent and minor variance applications submitted along with an OMB appeal (B064/14NY, A867/14NY, A868/14NY and A0467/19NY, A0468/19NY).
220 m away · filed Oct 1, 2020 · Approved
51 Bayview Wood · Minor variance
To construct a new dwelling. (Parts 1& 6)
220 m away · filed Oct 1, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.