Toronto address · Ward 20, Scarborough Southwest
2 Dodge Rd
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Application acceptable
Heating and ventilation
REV 01: Changes as per drawingsHVAC - Proposal for interior alterations including new windows, skylights, drain and plumbing.
Applied Sep 15, 2026 · Permit 26 118396 HVA (revision 01)
- Permit issued
Heating and ventilation
HVAC - Proposal for interior alterations including new windows, skylights, drain and plumbing.
Applied Aug 7, 2026 · issued Aug 21, 2026 · Permit 26 118396 HVA
- Permit issued
Drains and site services
Drain - Proposal for interior alterations including new windows, skylights, drain and plumbing.
Applied Feb 18, 2026 · issued Apr 8, 2026 · Permit 26 118396 DRN
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations including new windows, skylights, drain and plumbing.
Applied Feb 18, 2026 · issued Apr 8, 2026 · Permit 26 118396 PLB
- Inspections under way
Small residential project · Interior alterations
Proposal for interior alterations including new windows, skylights, drain and plumbing.
Applied Feb 18, 2026 · issued Apr 8, 2026 · Permit 26 118396 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
121 homes · Residential
260 m away · Condominium · Approved · filed Jul 15, 2021
- Under review
12 storeys · 287 homes · Residential
280 m away · Site plan · Under review · filed Mar 23, 2022
- Under review
8 storeys · 112 homes · Residential
390 m away · Site plan · Under review · filed Aug 9, 2021
- Approved
Neighbours’ Committee of Adjustment files within 250 m
29 Red Deer Ave · Minor variance
To alter the existing one-storey dwelling by constructing a second storey and rear yard addition with a front and rear platform. There will be a total of two dwelling units on the lot.
230 m away · filed Jun 10, 2026 · Approved
163 Audrey Ave · Minor variance
To construct a new two-storey residential triplex dwelling with a basement walkout and convert the existing rear east yard shed into a two-storey garden suite. There will be a total of 4 dwelling units. The existing 1-storey dwelling will be demolished.
240 m away · filed Nov 3, 2025 · Approved
236 Warden Ave · Minor variance
To construct a new two-storey detached dwelling.
250 m away · filed Jan 31, 2025 · Application withdrawn
236 Warden Ave · Consent
To obtain consent to sever the property into three residential lots. The existing two-storey detached dwelling would be demolished. Cross reference minor variance applications A0034/25SC, A0035/25SC and A0036/25SC.
250 m away · filed Jan 31, 2025 · Application withdrawn
236 Warden Ave · Minor variance
250 m away · filed Jan 31, 2025 · Application withdrawn
236 Warden Ave · Minor variance
To construct a new two-storey detached dwelling. The existing two-storey detached dwelling will be demolished. Cross-reference Consent and Minor Variance Applications B0007/25SC, A0035/25SC and A0036/25SC.
250 m away · filed Jan 31, 2025 · Application withdrawn
25 Queensbury Ave · Minor variance
To alter the existing two-storey detached dwelling with a secondary suite, by constructing interior renovations to reinsulate the dwelling, cladding the dwelling, a new rear deck, enlocsing the front porch and elimnating one of the two exsiting parking spaces. NOTE: This Revised Public Hearing Notice is being issued to add variance #8 and correct the purpose of application.
220 m away · filed Oct 29, 2024 · Approved
18 East Rd · Minor variance
To construct a new 2-storey dwelling.
240 m away · filed Dec 1, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.