Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

2 Wilmar Rd

The City of Toronto has 5 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Rev 01 - Revised garage, rear porch slabs, and walk-out location.Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwleling with basement walkout, integral garage, and second storey balcony

    Applied Oct 6, 2022 · issued Jan 30, 2024 · Permit 21 243003 BLD (revision 01)

    Revision issued
  • Demolition

    Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwleling with basement walkout, integral garage, and second storey balcony

    Applied Dec 7, 2021 · issued Mar 1, 2022 · completed Jun 16, 2025 · 1 home removed · Permit 21 245822 DEM

    Closed
  • Heating and ventilation

    HVAC - Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwelling with basement walkout, integral garage, and second storey balcony

    Applied Dec 6, 2021 · issued Mar 1, 2022 · Permit 21 243003 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwleling with basement walkout, integral garage, and second storey balcony

    Applied Dec 6, 2021 · issued Mar 1, 2022 · Permit 21 243003 PLB

    Inspections under way
  • New house · New building

    Proposal to demolish existing dwelling to construct new 2 storey Single Family Dwleling with basement walkout, integral garage, and second storey balcony

    Applied Nov 29, 2021 · issued Mar 1, 2022 · 1 home added · Permit 21 243003 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To construct a new detached dwelling with an attached garage.

    Decision: Approved (hearing Jul 13, 2021)

    Filed Jun 2, 2020 · File A0420/20EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 3925 Bloor St W · Minor variance

    To construct a new apartment building containing 52 dwelling units.

    80 m away · filed Sep 3, 2026 · Tentatively scheduled

  • 3908 Bloor St W · Minor variance

    To construct a second and third storey addition above the existing dwelling, a three-storey front addition, and a two-storey garden suite in the rear yard. The altered dwelling will be converted into a fourplex.

    90 m away · filed Jul 7, 2025 · Approved

  • 4 Statler Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    200 m away · filed May 30, 2025 · Approved

  • 27 Wilmar Rd · Minor variance

    To construct a one-storey rear addition and a rear yard deck.

    210 m away · filed Jun 10, 2024 · Withdrawn

  • 4 Wilmar Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    60 m away · filed Sep 22, 2023 · Approved

  • 4 Wilmar Rd · Minor variance

    To maintain the existing dwelling and to remove a portion of the existing attached garage.

    60 m away · filed Sep 21, 2023 · Approved

  • 4 Wilmar Rd · Consent

    To obtain consent to sever the lot into two undersized residential lots.

    60 m away · filed Sep 21, 2023 · Approved

  • 7 Charleston Rd · Minor variance

    To construct a new detached dwelling with an attached garage.

    160 m away · filed May 30, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.