Toronto address · Ward 9, Davenport
20 Jenet Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Addition or alteration · Multiple projects
Rev 01: TO CONVERT THE GROUND FLOOR FROM ONE TO 5 UNITS.
Applied Nov 17, 2022 · issued Jan 9, 2023 · completed Nov 19, 2025 · Permit 21 179069 BLD (revision 01)
- Cancelled
Heating and ventilation
Rev 01: TO CONVERT THE GROUND FLOOR FROM ONE TO 5 UNITS.
Applied Nov 17, 2022 · completed Nov 28, 2025 · Permit 21 179069 HVA (revision 01)
- Cancelled
Plumbing
Rev 01: TO CONVERT THE GROUND FLOOR FROM ONE TO 5 UNITS.
Applied Nov 17, 2022 · issued Dec 9, 2022 · completed Nov 19, 2025 · Permit 21 179069 PLB (revision 01)
- Cancelled
Addition or alteration · Multiple projects
Proposal for 2nd storey addition, 2 storey rear addition and interior alterations.Existing Motor Vehicle Repair Shop, class B (Body Shop) on ground floor and Designer's Studio/Performing Arts Studio on new second floor. Refer to related CofA Approval.
Applied Jul 3, 2021 · issued Dec 3, 2021 · completed Nov 28, 2025 · Permit 21 179069 BLD
- Cancelled
Heating and ventilation
HVAC - Proposal for 2nd storey addition, 2 storey rear addition and interior alterations
Applied Jul 3, 2021 · issued Dec 3, 2021 · completed Nov 19, 2025 · Permit 21 179069 HVA
- Cancelled
Plumbing
Plumbing - Proposal for 2nd storey addition, 2 storey rear addition and interior alterations
Applied Jul 3, 2021 · issued Dec 3, 2021 · completed Nov 19, 2025 · Permit 21 179069 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the existing one-storey detached building by constructing a rear two-storey addition, a second storey addition, and by providing rear stair access.
Decision: Approved (hearing Dec 10, 2020)
Filed Jul 8, 2020 · File A0603/20TEY
What’s planned nearby
Development sites within 500 m
- Under review
21 storeys · 861 homes · Residential
220 m away · Site plan · Under review · filed Nov 7, 2024
- Under review
33 storeys · 634 homes · Mixed use
230 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
230 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
19 storeys · 325 homes · Mixed use
350 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
450 m away · Site plan · Under review · filed Aug 20, 2021
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
490 m away · Rezoning · Approved · filed Feb 9, 2026
Neighbours’ Committee of Adjustment files within 250 m
1286 Bloor St W · Minor variance
To alter the existing three-storey mixed use building by constructing a rooftop mechanical penthouse with rooftop access and a rooftop access enclosure above the third storey with a partially covered rooftop terrace and a trellis. The ground floor and partial ground floor mezzanine level will contain a commercial unit (art gallery and event space). The second storey will contain a multi-function commercial space that supports StepStones for Youth's programming and the provides amenity space for building residents (counselling rooms, a gym, a break room, and an open-concept collaboration space…
240 m away · filed Sep 2, 2026 · Postponed
1281 Bloor St W · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two mixed-use lots which merged on title.
240 m away · filed Mar 4, 2026 · Approved
763 Lansdowne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear deck, a rear one-storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (detached garage with a workshop and storage space above) in the rear yard, abutting the laneway.
170 m away · filed Aug 26, 2025 · Approved
193 Rankin Cres · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.
240 m away · filed May 6, 2025 · Approved
493 St Clarens Ave · Minor variance
To convert the existing two-storey semi-detached dwelling (one-unit dwelling into three-units) with a rear basement walkout, and a rear second storey balcony with a staircase leading into the rear yard. This dwelling will have one primary unit and two secondary suites (one within the basement and one on the second level). The two parking spaces in the rear yard (abutting the laneway) will be maintained.
200 m away · filed Nov 16, 2022 · Approved
83 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a complete third storey addition. Also, to construct a rear one-storey ancillary building (office space).
220 m away · filed Nov 3, 2022 · Approved
57 Wade Ave · Minor variance
To permit the increase of overall building height, rooftop mechanical penthouse height, and changes to parking spaces, provided within the seven-storey office building, as approved by Site Specific Zoning By-law 1664-2019.
110 m away · filed Jun 27, 2022 · Approved
541 St Clarens Ave · Minor variance
To convert the existing two-storey detached dwelling from one-unit into three-units through interior alterations.
250 m away · filed Apr 27, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.