Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

57 Wade Ave

The City of Toronto has 11 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    REVISION - Relocation of Fan Coil Units to exit stairwells on Level 3,5&7 to maintain fire rating integrity of the exit stairs.HVAC - Proposal to construct a 8 storey mass timber construction office building with retail at grade.

    Applied Mar 11, 2026 · issued Apr 10, 2026 · Permit 19 115513 HVA (revision 01)

    Revision issued
  • Partial permit · Partial permit - structural framing

    Part Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.

    Applied May 7, 2024 · issued Feb 20, 2025 · completed Feb 20, 2025 · Permit 19 115513 STR

    Closed
  • Partial permit · Partial permit - foundation

    Part Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.

    Applied Jan 25, 2024 · completed Jul 17, 2024 · Permit 19 115513 FND

    Superseded
  • Conditional permit · New building

    Conditional Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.

    Applied Jan 25, 2024 · completed Jan 25, 2024 · Permit 19 115513 BLD

    Cancelled
  • Conditional permit · Inside and outside drains

    Conditional Permit - Drain - Proposal to construct a 8 storey mass timber construction office building with retail at grade.

    Applied Jul 6, 2023 · completed Apr 3, 2025 · Permit 19 115513 STS

    Cancelled
  • Partial permit · Partial permit - shoring

    Part Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.

    Applied Apr 26, 2023 · completed Apr 3, 2024 · Permit 19 115513 SHO

    Superseded
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to construct a 8 storey mass timber construction office building with retail at grade.

    Applied Jul 19, 2019 · completed Jun 19, 2026 · Permit 19 115513 FSU

    Cancelled
  • Alternative solution

    It is proposed to design the glue laminated (glulam) columns to the applicable design provisions in Eurocode 5

    Applied Jul 11, 2019 · completed Oct 8, 2019 · Permit 19 187485 ALT

    Approved
  • Drains and site services

    Drain - Proposal to construct a 8 storey mass timber construction office building with retail at grade.

    Applied Feb 14, 2019 · issued Apr 3, 2024 · Permit 19 115513 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a 8 storey mass timber construction office building with retail at grade.

    Applied Feb 14, 2019 · issued Aug 8, 2024 · Permit 19 115513 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a 8 storey mass timber construction office building with retail at grade.

    Applied Feb 14, 2019 · issued Jul 17, 2024 · Permit 19 115513 PLB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit the increase of overall building height, rooftop mechanical penthouse height, and changes to parking spaces, provided within the seven-storey office building, as approved by Site Specific Zoning By-law 1664-2019.

    Decision: Approved (hearing Oct 12, 2022)

    Filed Jun 27, 2022 · File A0747/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1319 Bloor St W · Consent

    To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.

    200 m away · filed Sep 3, 2025 · Approved

  • 193 Rankin Cres · Minor variance

    To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.

    240 m away · filed May 6, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…

    200 m away · filed Apr 2, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    200 m away · filed Aug 16, 2024 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    220 m away · filed Jan 17, 2024 · Refused

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    200 m away · filed Dec 12, 2023 · Approved

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    220 m away · filed Jun 1, 2023 · Approved

  • 109 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.

    230 m away · filed Nov 3, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.