Toronto address · Ward 9, Davenport
57 Wade Ave
The City of Toronto has 11 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Heating and ventilation
REVISION - Relocation of Fan Coil Units to exit stairwells on Level 3,5&7 to maintain fire rating integrity of the exit stairs.HVAC - Proposal to construct a 8 storey mass timber construction office building with retail at grade.
Applied Mar 11, 2026 · issued Apr 10, 2026 · Permit 19 115513 HVA (revision 01)
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.
Applied May 7, 2024 · issued Feb 20, 2025 · completed Feb 20, 2025 · Permit 19 115513 STR
- Superseded
Partial permit · Partial permit - foundation
Part Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.
Applied Jan 25, 2024 · completed Jul 17, 2024 · Permit 19 115513 FND
- Cancelled
Conditional permit · New building
Conditional Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.
Applied Jan 25, 2024 · completed Jan 25, 2024 · Permit 19 115513 BLD
- Cancelled
Conditional permit · Inside and outside drains
Conditional Permit - Drain - Proposal to construct a 8 storey mass timber construction office building with retail at grade.
Applied Jul 6, 2023 · completed Apr 3, 2025 · Permit 19 115513 STS
- Superseded
Partial permit · Partial permit - shoring
Part Permit - Construction of a new 7-storey (+ Mechanical Penthouse) building with one level of underground parking.
Applied Apr 26, 2023 · completed Apr 3, 2024 · Permit 19 115513 SHO
- Cancelled
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal to construct a 8 storey mass timber construction office building with retail at grade.
Applied Jul 19, 2019 · completed Jun 19, 2026 · Permit 19 115513 FSU
- Approved
Alternative solution
It is proposed to design the glue laminated (glulam) columns to the applicable design provisions in Eurocode 5
Applied Jul 11, 2019 · completed Oct 8, 2019 · Permit 19 187485 ALT
- Inspections under way
Drains and site services
Drain - Proposal to construct a 8 storey mass timber construction office building with retail at grade.
Applied Feb 14, 2019 · issued Apr 3, 2024 · Permit 19 115513 DRN
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a 8 storey mass timber construction office building with retail at grade.
Applied Feb 14, 2019 · issued Aug 8, 2024 · Permit 19 115513 HVA
- Inspections under way
Plumbing
Plumbing - Proposal to construct a 8 storey mass timber construction office building with retail at grade.
Applied Feb 14, 2019 · issued Jul 17, 2024 · Permit 19 115513 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To permit the increase of overall building height, rooftop mechanical penthouse height, and changes to parking spaces, provided within the seven-storey office building, as approved by Site Specific Zoning By-law 1664-2019.
Decision: Approved (hearing Oct 12, 2022)
Filed Jun 27, 2022 · File A0747/22TEY
What’s planned nearby
Development sites within 500 m
- Under review
21 storeys · 861 homes · Residential
110 m away · Site plan · Under review · filed Nov 7, 2024
- Under review
33 storeys · 634 homes · Mixed use
160 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
230 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
19 storeys · 325 homes · Mixed use
240 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
340 m away · Site plan · Under review · filed Aug 20, 2021
- Approved
33 storeys · 377 homes · Residential
400 m away · Rezoning · Approved · filed Dec 24, 2025
Neighbours’ Committee of Adjustment files within 250 m
1319 Bloor St W · Consent
To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.
200 m away · filed Sep 3, 2025 · Approved
193 Rankin Cres · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey rooftop deck.
240 m away · filed May 6, 2025 · Approved
1319 Bloor St W · Minor variance
To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…
200 m away · filed Apr 2, 2025 · Approved
1319 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.
200 m away · filed Aug 16, 2024 · Approved
105 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.
220 m away · filed Jan 17, 2024 · Refused
104 Campbell Ave · Minor variance
To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.
200 m away · filed Dec 12, 2023 · Approved
105 Campbell Ave · Minor variance
To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.
220 m away · filed Jun 1, 2023 · Approved
109 Campbell Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition.
230 m away · filed Nov 3, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.