Toronto address · Ward 13, Toronto Centre
20 Palace St
The City of Toronto has 4 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Interior alterations
Proposed interior alteration and water damage repair
Applied May 11, 2020 · issued Jun 12, 2020 · Permit 20 144257 BLD
- Closed
Addition or alteration · Interior alterations
Interior alterations to repair existing fire separations due to water damage to the building.
Applied Nov 28, 2018 · issued Nov 30, 2018 · completed Jan 2, 2019 · Permit 18 261822 BLD
- Cancelled
Designated structure · Sign building permit related
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated projecting sign displaying static copy, located on the first storey of the west? elevation. The proposed sign is 0.86 metres vertically by 0.86 metres horizontally.**TORI'S BAKESHOP**
Applied Oct 19, 2017 · completed Oct 9, 2019 · Permit 17 250593 DST
- Closed
Designated structure · Sign building permit related
In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the first storey south elevation. The proposed sign is 0.86 metres vertically by 3.65 metres horizontally at a height of 3.94 metres above grade.**EXPEDIA CRUISE SHIP CENTRES**
Applied Jun 28, 2017 · issued Jul 13, 2017 · completed Aug 28, 2017 · Permit 17 188991 DST
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
43 storeys · 997 homes · Residential
120 m away · Site plan · Under review · filed Mar 23, 2023
- Under review
1-16 Sumach Street and 90 Eastern Avenue
55 storeys · 1,284 homes · Mixed use
170 m away · Site plan · Under review · filed Oct 21, 2025
- Under review
31 storeys · 859 homes · Mixed use
200 m away · Site plan · Under review · filed Apr 25, 2022
- Under review
45 storeys · 653 homes · Mixed use
350 m away · Site plan · Under review · filed Apr 9, 2021
- Submitted
20 storeys · 297 homes · Residential
370 m away · Site plan · Submitted · filed Apr 16, 2026
- Under review
15 storeys · 151 homes · Residential
380 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
425 Cherry St · Minor variance
To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).
200 m away · filed May 29, 2020 · Approved
457 Front St E · Minor variance
To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.
120 m away · filed Nov 8, 2019 · Approved
507 King St E · Minor variance
To alter the existing four-storey mixed-use building by performing interior renovations to support office uses, by creating an open rooftop amenity space, and by constructing a rear fourth storey amenity space addition and front and rear fourth storey additions for rooftop access via stair and elevator.
230 m away · filed Oct 4, 2019 · Approved
475 Front St E · Minor variance
To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.
140 m away · filed Mar 20, 2018 · Approved
3 Percy St · Minor variance
To alter the existing two-storey rowhouse by re-constructing the rear one-storey addition.
220 m away · filed Feb 21, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.