Toronto address · Ward 13, Toronto Centre
457 Front St E
The City of Toronto has 13 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Other
Minor interior and exterior retro-fitting of exterior insulated spandrel panels to swap the existing banking equipment with new banking equipment.
Applied Sep 12, 2024 · issued Oct 17, 2024 · completed Aug 21, 2025 · Permit 24 212170 BLD
- Closed
Heating and ventilation
HVAC - Interior renovation of existing bank branch with minor exterior facade alteration.
Applied Jan 14, 2022 · issued Mar 7, 2022 · completed Oct 9, 2024 · Permit 22 104105 HVA
- Closed
Addition or alteration · Interior alterations
Interior renovation of existing bank branch with minor exterior facade alteration.
Applied Jan 14, 2022 · issued Mar 7, 2022 · completed Mar 13, 2024 · Permit 22 104105 BLD
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal for interior alteration from vacant use to animal hospital 11D
Applied Apr 26, 2021 · Permit 21 144603 FSU
- Closed
Addition or alteration · Interior alterations
Proposal for interior alteration from vacant use to animal hospital 11D
Applied Apr 22, 2021 · issued May 18, 2021 · completed Feb 4, 2022 · Permit 21 144603 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for interior alteration from vacant use to animal hospital 11D
Applied Apr 22, 2021 · issued May 20, 2021 · Permit 21 144603 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alteration from vacant use to animal hospital 11D
Applied Apr 22, 2021 · issued May 20, 2021 · Permit 21 144603 HVA
- Closed
Plumbing
Revision to Plumbing - OP1 and OP3 plumbing fixtures to be capped and completed at a later date. Cap plumbing fixtures in storage room where mechanical drawings have noted a washroom - Dr. K. Lamba Dentistry Professional Corp.Convenience address is 465 Front St E.
Applied Nov 5, 2020 · issued Nov 13, 2020 · completed Nov 16, 2020 · Permit 19 214274 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Rev 1: REVISION TO PERMIT 19 214274 BLD 00 BA, RELOCATION OF STANDPIPE SYSTEM TO A SURFACE MOUNTED LOCATION WITHIN THE UNIT.Proposal for interior alterations to convert retail space on the ground floor to dental clinic.Convenience address is 465 Front St E.
Applied Sep 30, 2020 · issued Oct 15, 2020 · completed Oct 23, 2020 · Permit 19 214274 BLD (revision 01)
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposal for interior alterations to convert retail space on the ground floor to dental clinic.Convenience address is 465 Front St E.
Applied Dec 20, 2019 · Permit 19 214274 FSU
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to convert retail space on the ground floor to dental clinic.Convenience address is 465 Front St E.
Applied Aug 30, 2019 · issued Feb 26, 2020 · completed Oct 23, 2020 · Permit 19 214274 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to convert retail space on the ground floor to dental clinic.Convenience address is 465 Front St E.
Applied Aug 30, 2019 · issued Feb 26, 2020 · completed Oct 20, 2020 · Permit 19 214274 HVA
Show 1 more permit
- Closed
Plumbing
Plumbing - Proposal for interior alterations to convert retail space on the ground floor to dental clinic.Convenience address is 465 Front St E.
Applied Aug 30, 2019 · issued Feb 26, 2020 · completed Nov 16, 2020 · Permit 19 214274 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.
Decision: Approved (hearing Feb 5, 2020)
Filed Nov 8, 2019 · File A1152/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
31 storeys · 859 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 25, 2022
- Under review
43 storeys · 997 homes · Residential
210 m away · Site plan · Under review · filed Mar 23, 2023
- Under review
45 storeys · 653 homes · Mixed use
230 m away · Site plan · Under review · filed Apr 9, 2021
- Under review
1-16 Sumach Street and 90 Eastern Avenue
55 storeys · 1,284 homes · Mixed use
260 m away · Site plan · Under review · filed Oct 21, 2025
- Approved
324 Cherry Street and 429 Lake Shore Boulevard East
53 storeys · 4,994 homes · Mixed use
270 m away · Rezoning · Approved · filed Jun 10, 2025
- Submitted
20 storeys · 297 homes · Residential
390 m away · Site plan · Submitted · filed Apr 16, 2026
Neighbours’ Committee of Adjustment files within 250 m
425 Cherry St · Minor variance
To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).
110 m away · filed May 29, 2020 · Approved
391 Cherry St · Minor variance
To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.
220 m away · filed Mar 21, 2019 · Approved
475 Front St E · Minor variance
To modify the redevelopment plan for Phase 2 of the West Don Lands approved by Site-specific By-law 4-2011 by constructing a new mixed-use building, which will exceed the maximum permitted heights, comprised of a twelve-storey tower on Front Street, a nine-storey tower on Mill Street, and two five-storey podiums connecting the two building towers.
100 m away · filed Mar 20, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.