391 Cherry St

The City of Toronto has 15 building permits since 2017 (8 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    3 Wall Signs

    Applied Aug 22, 2024 · issued Aug 26, 2024 · completed Dec 15, 2025 · Permit 24 202319 DST

    Closed
  • Designated structure · Sign building permit related

    3 Wall Signs

    Applied Aug 19, 2024 · completed Aug 20, 2024 · Permit 24 200393 DST

    Cancelled
  • Fire and security upgrade · Electromagnetic locks

    Proposed installtion of Electromagnetic locks (Maglocks) - 6 Maglocks on Parking level 1, 1 Maglock on the Mezzanine Lobby

    Applied Jun 27, 2023 · issued Jul 12, 2023 · Permit 23 166965 FSU

    Inspections under way
  • Conditional permit · New building

    Conditional Permit - Proposal to construct a new mixed-use building consisting of three towers (two - 16 storey towers ( Tower A & B) + one 26 storey ( Tower C) and podiums with a shared one level below grade garage. A total of 770 rental housing units are proposed, with 231 units for affordable rental housing.

    Applied Mar 31, 2022 · issued Jul 26, 2022 · completed Aug 25, 2022 · Permit 19 217279 BLD

    Cancelled
  • Alternative solution

    Alternative solution for permit 19 217279 to provide a 65 mm stndpipe system hose valve connections in general conformance with the 2015 national building code (nbc) and the 2013 edition of NFPA14 standard for installation of standpipe and hose system (as reference by the nbc and the obc) in this fully sprinklered buidling.

    Applied Jul 16, 2021 · completed Dec 16, 2021 · Permit 21 185461 ALT

    Approved
  • Alternative solution

    Proposal for buiilding 8A, level 2 dead-end corridor

    Applied May 30, 2021 · completed Jul 22, 2021 · Permit 21 162793 ALT

    Approved
  • Conditional permit · Partial permit - structural framing

    Conditional Permit - Part Permit - Proposal to construct a new mixed-use building consisting of three towers (two - 16 storey towers ( A & B) + one 26 storey ( Tower C)) and podiums with a shared below grade garage. A total of 770 rental housing units are proposed, with 231 units for affordable rental housing.

    Applied May 13, 2020 · issued Aug 14, 2020 · completed Jul 26, 2022 · Permit 19 217279 STR

    Cancelled
  • Drains and site services · Inside and outside drains

    Drain - Proposal to construct a new mixed-use building consisting of three towers (two - 16 storey towers + one 26 storey) and podiums with a shared below grade garage. A total of 770 rental housing units are proposed, with 231 units for affordable rental housing.

    Applied Sep 27, 2019 · Permit 19 217279 STS

    Application acceptable
  • Heating and ventilation

    HVAC - Proposal to construct a new mixed-use building consisting of three towers (two - 16 storey towers + one 26 storey) and podiums with a shared below grade garage. A total of 770 rental housing units are proposed, with 231 units for affordable rental housing.

    Applied Sep 27, 2019 · issued Jul 26, 2022 · Permit 19 217279 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new mixed-use building consisting of three towers (two - 16 storey towers + one 26 storey) and podiums with a shared below grade garage. A total of 770 rental housing units are proposed, with 231 units for affordable rental housing.

    Applied Sep 27, 2019 · issued Jul 26, 2022 · Permit 19 217279 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a new mixed-use building consisting of three towers (two - 16 storey towers + one 26 storey) and podiums with a shared below grade garage. A total of 770 rental housing units are proposed, with 231 units for affordable rental housing.

    Applied Sep 27, 2019 · issued Apr 19, 2021 · Permit 19 217279 DRN

    Inspections under way
  • Addition or alteration · Shoring

    Standalone shoring and excavation for soil remediation purposes.

    Applied Jul 18, 2019 · issued Sep 19, 2019 · Permit 19 191262 BLD

    Inspections under way
Show 3 more permits
  • Temporary structure · Temporary structures

    Proposal to erect 1 temporary structure for invictus games. Start date 15 sep. 2017; end date 2 oct. 2017

    Applied Sep 13, 2017 · issued Sep 14, 2017 · completed Sep 28, 2017 · Permit 17 231928 TPS

    Closed
  • Temporary structure · Certified tents

    Proposal to erect 1 60' by15' tent. To be erected September 9 and dismantled Sept 26, 2016S60 Fiesta Solar Frame Certified Tent No. 14-241374 CE"World Cup Today" WORLD CUP OF HOCKEY VILLAGE

    Applied Aug 30, 2016 · issued Sep 2, 2016 · completed Apr 10, 2018 · Permit 16 215447 TPS

    Closed
  • Temporary structure · Certified tents

    Proposal to install 7 temporary certified tents from Sep 3, 2016 to Sep 26, 2016 for the "World Cup of Hockey" Fan Village. Convenience address is 121-175 Mill Street.

    Applied Aug 25, 2016 · issued Sep 2, 2016 · completed Apr 10, 2018 · Permit 16 213253 TPS

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a new mixed-use building consisting of three towers and podiums with a shared below grade garage. A total of 761 rental housing units are proposed, with 238 units for affordable rental housing.

    Decision: Approved (hearing Jun 26, 2019)

    Filed Mar 21, 2019 · File A0289/19TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 55 Mill St · Consent

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.

    240 m away · filed Dec 30, 2025 · Approved

  • 425 Cherry St · Minor variance

    To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).

    170 m away · filed May 29, 2020 · Approved

  • 457 Front St E · Minor variance

    To alter the existing 11-storey mixed-use building approved under Site-Specific By-law 4-2011 by converting a portion of the first storey from a retail use to a dental clinic.

    220 m away · filed Nov 8, 2019 · Approved

Everything planned in Spadina-Fort York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.