Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 3, Etobicoke-Lakeshore

20 Queens Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    REVISION 02: Front and Rear deckRevision 01: revised structural design (steel columns changed to wood)Proposal for 3-storey rear addition and new 3rd floor above existing 2-storey house.

    Applied Apr 4, 2018 · issued May 2, 2018 · completed Dec 11, 2018 · Permit 15 197664 BLD (revision 02)

    Closed
  • Plumbing

    Plumbing - Proposal for 3-storey rear addition and new 3rd floor above existing 2-storey house.

    Applied Jun 6, 2016 · issued Jun 6, 2016 · completed Feb 3, 2017 · Permit 15 197664 PLB

    Closed
  • Heating and ventilation

    Revision 01: revised floor plans/HVAC layout (radiators removed - forced air instead)HVAC - Proposal for 3-storey rear addition and new 3rd floor above existing 2-storey house.

    Applied Mar 14, 2016 · issued May 10, 2016 · completed Feb 3, 2017 · Permit 15 197664 HVA (revision 01)

    Closed
  • Small residential project · Addition(s)

    Revision 01: revised structural design (steel columns changed to wood)Proposal for 3-storey rear addition and new 3rd floor above existing 2-storey house.

    Applied Mar 14, 2016 · issued May 9, 2016 · completed Dec 11, 2018 · Permit 15 197664 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for 3-storey rear addition and new 3rd floor above existing 2-storey house.

    Applied Jul 27, 2015 · issued Nov 5, 2015 · completed Feb 3, 2017 · Permit 15 197664 HVA

    Closed
  • Small residential project · Addition(s)

    Proposal for 3-storey rear addition and new 3rd floor above existing 2-storey house.

    Applied Jul 27, 2015 · issued Nov 5, 2015 · completed Dec 11, 2018 · Permit 15 197664 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2502 Lake Shore Blvd W · Minor variance

    To construct a new laneway suite.

    240 m away · filed Sep 8, 2026 · Hearing scheduled

  • 26 Central St · Minor variance

    To construct a new detached dwelling with an attached garage.

    210 m away · filed Aug 24, 2026 · Hearing scheduled

  • 40 Wheatfield Rd · Minor variance

    To construct a second storey addition above the existing dwelling.

    100 m away · filed May 14, 2026 · Approved

  • 27 Miles Rd · Minor variance

    To construct a second storey rear addition above the existing dwelling.

    250 m away · filed Mar 19, 2025 · Approved

  • 2502 Lake Shore Blvd W · Minor variance

    To construct a new fourplex.

    240 m away · filed Jan 15, 2025 · Approved

  • 63 Queens Ave · Minor variance

    To construct a one-storey front addition, a second and third storey addition above the existing dwelling and to convert the basement into a secondary suite.

    220 m away · filed Mar 6, 2023 · Approved

  • 14 Wheatfield Rd · Minor variance

    To make interior alterations to accommodate a second secondary suite, to construct a second storey rear addition and a rear yard deck. A total of two secondary suites are proposed.

    150 m away · filed Oct 26, 2022 · Approved

  • 61 Queens Ave · Minor variance

    To construct a one-storey rear addition and a two-storey addition above the existing dwelling. The existing detached garage in the rear yard will be maintained.

    220 m away · filed Oct 20, 2022 · Approved

Everything planned in Etobicoke-Lakeshore

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.