Toronto address · Ward 18, Willowdale
20 Sheppard Ave W
Sheppard Yonge Station
The City of Toronto has 42 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations of an existing suite - including minor architectural, HVAC, plumbing, and electrical work
Applied Jul 28, 2025 · issued Jul 30, 2025 · completed Jan 28, 2026 · Permit 25 201666 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations of an existing suite - including minor architectural, HVAC, plumbing, and electrical work
Applied Jul 28, 2025 · issued Aug 15, 2025 · completed Dec 18, 2025 · Permit 25 201666 HVA
- Closed
Plumbing
Plumbing - Proposed interior alterations of an existing suite - including minor architectural, HVAC, plumbing, and electrical work
Applied Jul 28, 2025 · issued Aug 15, 2025 · completed Dec 18, 2025 · Permit 25 201666 PLB
- Closed
Plumbing · Backflow prevention devices (Water only)
Installation of backflow prevention for the Toronto Transit Commission's Sheppard-Yonge Station.
Applied May 7, 2024 · issued Jun 5, 2024 · completed Feb 26, 2026 · Permit 24 145339 PSA
- Permit issued
Heating and ventilation · Special ventilation system
Proposed a split air-conditioning system for gsm office room 51P-316.
Applied Jun 26, 2023 · issued Aug 29, 2023 · Permit 23 166118 MSA
- Permit issued
Plumbing
Plumbing - On-grade pavement rehab of TTC bus loop and cable duct in Harlandale Ave and associated work
Applied Sep 6, 2022 · issued Mar 9, 2023 · Permit 22 200141 PLB
- Permit issued
Addition or alteration · Other
On-grade pavement rehab of TTC bus loop and cable duct in Harlandale Ave and associated work
Applied Sep 6, 2022 · issued Mar 9, 2023 · Permit 22 200141 BLD
- Closed
Addition or alteration · Interior alterations
Rev 01 - Proposed revision to add alternative egress path The alternative egress will follow a path along the south side platform, towards an existing mechanical room at the SE corner of the south platformInterior alterations including new wall assemblies, mechanical, plumbing and life safety for ancillary training at TTC Sheppard-Yonge Station.
Applied Dec 1, 2020 · issued Dec 23, 2020 · completed May 26, 2023 · Permit 17 273392 BLD (revision 01)
- Closed
Heating and ventilation
Rev 01 - Proposed revision to add alternative egress path The alternative egress will follow a path along the south side platform, towards an existing mechanical room at the SE corner of the south platformHVAC - Interior alterations including new wall assemblies, mechanical, plumbing and life safety for ancillary training at TTC Sheppard-Yonge Station.
Applied Dec 1, 2020 · issued Dec 23, 2020 · completed May 19, 2023 · Permit 17 273392 HVA (revision 01)
- Closed
Plumbing
Rev 01 - Proposed revision to add alternative egress path The alternative egress will follow a path along the south side platform, towards an existing mechanical room at the SE corner of the south platformPlumbing - Interior alterations including new wall assemblies, mechanical, plumbing and life safety for ancillary training at TTC Sheppard-Yonge Station.
Applied Dec 1, 2020 · issued Dec 18, 2020 · completed May 19, 2023 · Permit 17 273392 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Revision 02 - Revision to fire protection system, proposing to remove the sprinkler head in the storage area and provide a heat detector instead.Revision 01 - kitchenette additionInterior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Sep 30, 2020 · issued Oct 6, 2020 · completed Nov 30, 2023 · Permit 18 269679 BLD (revision 02)
- Closed
Heating and ventilation
Revision 01 - kitchenette additionHVAC - Interior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Sep 2, 2020 · issued Sep 14, 2020 · completed Aug 18, 2025 · Permit 18 269679 HVA (revision 01)
Show 30 more permits
- Closed
Plumbing
Plumbing - Interior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Sep 2, 2020 · issued Sep 14, 2020 · completed Sep 12, 2022 · Permit 18 269679 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Revision 01 - kitchenette additionInterior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Sep 2, 2020 · issued Sep 23, 2020 · completed Nov 30, 2023 · Permit 18 269679 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Interior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Dec 18, 2018 · issued Feb 13, 2019 · completed Aug 18, 2025 · Permit 18 269679 HVA
- Closed
Plumbing
Plumbing - Interior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Dec 18, 2018 · issued Feb 13, 2019 · completed Sep 12, 2022 · Permit 18 269679 PLB
- Closed
Addition or alteration · Interior alterations
Interior Alterations including new wall assemblies mechaical, plumbing and life safety for new acillary space zone hub and station mangers office space.
Applied Dec 18, 2018 · issued Feb 13, 2019 · completed Nov 30, 2023 · Permit 18 269679 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations for Starbucks unit 227/22
Applied Jun 27, 2018 · issued Jul 13, 2018 · completed Nov 8, 2018 · Permit 18 185682 BLD
- Cancelled
Plumbing
Plumbing - Interior Alterations including new wall assemblies, mechanical, plumbing and life safety for new acillary space - space - zone hub and station managers office space.
Applied May 3, 2018 · completed May 28, 2020 · Permit 18 152959 PLB
- Cancelled
Addition or alteration · Interior alterations
Interior Alterations including new wall assemblies, mechanical, plumbing and life safety for new acillary space - space - zone hub and station managers office space.
Applied May 3, 2018 · completed May 28, 2020 · Permit 18 152959 BLD
- Cancelled
Heating and ventilation
HVAC - Interior Alterations including new wall assemblies, mechanical, plumbing and life safety for new acillary space - space - zone hub and station managers office space.
Applied May 3, 2018 · completed May 28, 2020 · Permit 18 152959 HVA
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing transit station.
Applied Jan 30, 2018 · issued Mar 2, 2018 · completed May 28, 2021 · Permit 18 111381 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing transit station.
Applied Jan 30, 2018 · issued Mar 2, 2018 · completed May 31, 2021 · Permit 18 111381 BLD
- Closed
Heating and ventilation · Other
Installation of new air conditioning units. Installation of new DCW hose bibb
Applied Jan 29, 2018 · issued Feb 20, 2018 · completed Mar 11, 2019 · Permit 18 111066 MSA
- Closed
Plumbing · Other
Installation of new air conditioning units. Installation of new DCW hose bibb
Applied Jan 29, 2018 · issued Feb 20, 2018 · completed Mar 8, 2019 · Permit 18 111062 PSA
- Closed
Addition or alteration · Interior alterations
Interior alterations including new wall assemblies, mechanical, plumbing and life safety for ancillary training at TTC Sheppard-Yonge Station.
Applied Dec 8, 2017 · issued Jan 19, 2018 · completed May 26, 2023 · Permit 17 273392 BLD
- Closed
Plumbing
Plumbing - Interior alterations including new wall assemblies, mechanical, plumbing and life safety for ancillary training at TTC Sheppard-Yonge Station.
Applied Dec 8, 2017 · issued Jan 29, 2018 · completed May 19, 2023 · Permit 17 273392 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations including new wall assemblies, mechanical, plumbing and life safety for ancillary training at TTC Sheppard-Yonge Station.
Applied Dec 8, 2017 · issued Jan 29, 2018 · completed May 19, 2023 · Permit 17 273392 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations for removal of existing fare gate and installation of new Presto fare gates. TTC YONGE & SHEPPARD station.
Applied Nov 10, 2017 · issued Dec 15, 2017 · completed Mar 26, 2019 · Permit 17 260897 BLD
- Closed
Heating and ventilation
HVAC - Convert the existing retail store to a Starbucks Coffee (no seating) - Sheppard Subway TTC
Applied Dec 16, 2016 · issued Mar 20, 2017 · completed Dec 19, 2018 · Permit 16 268068 HVA
- Closed
Plumbing
Plumbing - Convert the existing retail store to a Starbucks Coffee (no seating) - Sheppard Subway TTC
Applied Dec 16, 2016 · issued Mar 20, 2017 · completed Nov 9, 2018 · Permit 16 268068 PLB
- Inspections under way
Addition or alteration · Interior alterations
Convert the existing retail store to a Starbucks Coffee (no seating) - Sheppard Subway TTC
Applied Dec 16, 2016 · issued Mar 20, 2017 · Permit 16 268068 BLD
- Permit issued
Addition or alteration · Interior alterations
Interior alterations to storage area to create workshops and storage area
Applied Jul 30, 2013 · issued Aug 12, 2013 · Permit 13 213365 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations to storage area to create workshops and storage area
Applied Jul 30, 2013 · issued Aug 29, 2013 · completed Aug 22, 2025 · Permit 13 213365 HVA
- Closed
Plumbing
Plumbing - Interior alterations to storage area to create workshops and storage area
Applied Jul 30, 2013 · issued Aug 29, 2013 · completed Aug 22, 2025 · Permit 13 213365 PLB
- Inspections under way
Addition or alteration · Interior alterations
To put a Kiosk in the lower station of Sheppard & Eglinton Subway line
Applied Apr 26, 2005 · issued Jun 21, 2005 · Permit 05 126493 BLD
- Closed (dormant)
Plumbing
Plumbing - To put a Kiosk in the lower station of Sheppard & Eglinton Subway line - Interior Alterations
Applied Apr 26, 2005 · issued Jun 21, 2005 · completed Jun 8, 2026 · Permit 05 126493 PLB
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing TTC storage space on concourse level. Tenant: Clothing Store - units 208 & 211.
Applied Aug 20, 2004 · issued Oct 8, 2004 · Permit 04 167824 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposed intertior altertion to new cinnabon bakery in subway station.
Applied Nov 26, 2002 · issued Feb 20, 2003 · Permit 02 191907 BLD
- Closed (dormant)
Fire and security upgrade · Electromagnetic locks
Install 6 electromagnetic locks for sheppard subway - yonge st. Station; seed emergency exit
Applied Nov 12, 2002 · issued Nov 22, 2002 · completed Jun 8, 2026 · Permit 02 188171 FSU
- Closed (dormant)
Heating and ventilation
New subway station
Applied May 4, 1998 · issued Nov 25, 1998 · completed Jun 8, 2026 · Permit 98 251795 HVA
- Closed (dormant)
Plumbing
New subway station
Applied May 4, 1998 · issued Dec 25, 1998 · completed Jun 8, 2026 · Permit 98 251986 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
- Under review
53-63 Sheppard Avenue West and 62-68 Bogert Avenue
390 homes · Residential
190 m away · Condominium · Under review · filed Nov 6, 2021
- Under review
6 storeys · Not stated in the file
220 m away · Site plan · Under review · filed May 19, 2026
- Under review
51 storeys · 604 homes · Residential
250 m away · Site plan · Under review · filed Nov 12, 2025
- Under review
48 storeys · 479 homes · Mixed use
350 m away · Rezoning · Under review · filed Feb 6, 2026
- Approved
30 storeys · 2,385 homes · Mixed use
350 m away · Rezoning · Approved · filed Dec 9, 2024
Neighbours’ Committee of Adjustment files within 250 m
62 Sheppard Ave W · Minor variance
To allow the existing use of a car rental agency to continue in perpetuity and legalize the existing landuse and driveway width.
180 m away · filed Oct 3, 2025 · Approved
67 Elmhurst Ave · Minor variance
Proposal to construct a new two and a half storey single family detached dwelling.
220 m away · filed Mar 7, 2025 · Approved
53 Sheppard Ave W · Minor variance
Proposal to increase the building height, dwelling units, GFA and decrease in amenity space. (The application was deferred at the hearing of 9 May 2024)
160 m away · filed Mar 12, 2024 · Approved
53 Sheppard Ave W · Minor variance
To facilitate the development of 2 additional townhouse units within the same built form approved for the townhouse block in 2017 and reaffirmed in 2022 by the OLT.(approved 7 units proposing 9 units).
160 m away · filed Aug 1, 2023 · Approved
4866 Yonge St · Minor variance
Proposal to approval of 0 parking space where 21 parking space is required
160 m away · filed Nov 17, 2022 · Approved
62 Sheppard Ave W · Minor variance
Variance requested to permit existing car rental agency use on subject propety, request relief of the 1m landscape strip requirement in the rear yard, and request permission for a 4m wide drive aisle.
180 m away · filed Apr 7, 2022 · Approved
4850 Yonge St · Minor variance
To convert the second floor into a restaurant.
120 m away · filed Oct 29, 2021 · Approved
71 Elmhurst Ave · Minor variance
To construct a new dwelling.
230 m away · filed Apr 14, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.