Toronto address · Ward 15, Don Valley West
20 Vanderhoof Ave
The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposed rear addition and interior alteration at all floor levels in a 2 storey semi detached building.
Applied Dec 22, 2025 · issued Jan 7, 2026 · Permit 25 106565 HVA
- Revision issued
Small residential project · Multiple projects
Revision 1: INTERIOR LAYOUTSProposed rear addition and interior alteration at all floor levels in a 2 storey semi detached building.
Applied Dec 22, 2025 · issued Jan 16, 2026 · Permit 25 106565 BLD (revision 01)
- Inspections under way
Drains and site services
Drain - Proposed rear addition and interior alteration at all floor levels in a 2 storey semi detached building.
Applied Jan 20, 2025 · issued Mar 12, 2025 · Permit 25 106565 DRN
- Inspections under way
Plumbing
Plumbing - Proposed rear addition and interior alteration at all floor levels in a 2 storey semi detached building.
Applied Jan 20, 2025 · issued Mar 12, 2025 · Permit 25 106565 PLB
- Inspections under way
Small residential project · Multiple projects
Proposed rear addition and interior alteration at all floor levels in a 2 storey semi detached building.
Applied Jan 20, 2025 · issued Mar 12, 2025 · Permit 25 106565 BLD
- Cancelled
Drains and site services · Back water valve (Sewer only)
Proposed inside backwater valve.
Applied Mar 6, 2018 · issued Apr 3, 2018 · completed Oct 24, 2025 · Permit 18 125454 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
34 storeys · 1,616 homes · Residential
450 m away · Site plan · Approved · filed Aug 12, 2021
Neighbours’ Committee of Adjustment files within 250 m
42 Parklea Dr · Minor variance
To construct a new two-storey dwelling with a front covered porch and rear walk-out.
100 m away · filed Jul 22, 2026 · Approved
712 Eglinton Ave E · Minor variance
To construct a new Garden Suite in the rear yard. Currently new Fourplex under construction, related MV applications A0025/25NY and A0453/24NY.
220 m away · filed Jul 22, 2025 · Approved
712 Eglinton Ave E · Minor variance
To construct a 3-storey Fourplex. Development has been previously approved by file A0453/24NY, however revised proposal requires decreased front yard due to rear yard tree protection/preservation.
220 m away · filed Jan 21, 2025 · Approved
712 Eglinton Ave E · Minor variance
To construct a new 3 storey fourplex rental dwelling.
220 m away · filed Aug 27, 2024 · Approved
102 Parkhurst Blvd · Minor variance
Proposal to construct a one-storey rear addition to an existing two-storey detached dwelling.
170 m away · filed Aug 21, 2024 · Approved
109 Parkhurst Blvd · Minor variance
To construct a second-storey addition, one-storey rear addition, a new garage in the rear yard and removal of existing attached garage.
190 m away · filed Aug 18, 2024 · Approved
159 Parkhurst Blvd · Minor variance
To construct a front and rear second storey addition to the existing dwelling
220 m away · filed Nov 15, 2023 · Approved
167 Parkhurst Blvd · Minor variance
Proposal to construct a new dwelling.
240 m away · filed Aug 17, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.