Toronto address · Ward 9, Davenport
205 Westmoreland Ave
The City of Toronto has 2 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
Proposal to underpin and finish basement of existing semi-detached house for 1 secondary suite in basement. First floor to be used in conjunction with 2nd and third floors as one dwelling unit
Applied Jul 31, 2018 · issued Aug 22, 2019 · 1 home added · Permit 18 202407 BLD
- Cancelled
Heating and ventilation
HVAC - Proposal to underpin and finish basement of existing dwelling
Applied Jul 31, 2018 · completed Oct 2, 2018 · Permit 18 202407 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
Decision: Approved (hearing Feb 26, 2025)
Filed Apr 2, 2024 · File A0330/24TEY
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
195 Hallam St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
140 m away · filed Jan 15, 2026 · Approved
975 Dovercourt Rd · Minor variance
To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).
100 m away · filed Jan 20, 2025 · Deferred
181 Hallam St · Minor variance
To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.
80 m away · filed Jan 23, 2024 · Approved
216 Westmoreland Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.
30 m away · filed Nov 16, 2023 · Approved
208 Bartlett Ave · Minor variance
To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.
240 m away · filed Nov 2, 2023 · Approved
34 Fernbank Ave · Consent
To obtain consent for a technical severance to re-establish two residential lots which merged on title.
180 m away · filed Jun 21, 2023 · Approved
208 Bartlett Ave · Minor variance
To construct a new three-storey apartment building with front and rear balconies on the second and third floors. There will be a total of 10 dwelling units on this lot. All existing buildings will be demolished.
240 m away · filed Jun 2, 2023 · Refused
270 Westmoreland Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition with a third storey deck, new side exterior stairs leading to the first and second storeys, and a new rear first storey deck.
190 m away · filed Mar 6, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.