Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

205 Westmoreland Ave

The City of Toronto has 2 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal to underpin and finish basement of existing semi-detached house for 1 secondary suite in basement. First floor to be used in conjunction with 2nd and third floors as one dwelling unit

    Applied Jul 31, 2018 · issued Aug 22, 2019 · 1 home added · Permit 18 202407 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to underpin and finish basement of existing dwelling

    Applied Jul 31, 2018 · completed Oct 2, 2018 · Permit 18 202407 HVA

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).

    Decision: Approved (hearing Feb 26, 2025)

    Filed Apr 2, 2024 · File A0330/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 157 Hallam Street

    4 homes · Residential

    40 m away · Condominium · Approved · filed Jun 18, 2025

    Approved
  • 798 Dovercourt Road

    Residential

    440 m away · Condominium · Approved · filed Nov 14, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 195 Hallam St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.

    140 m away · filed Jan 15, 2026 · Approved

  • 975 Dovercourt Rd · Minor variance

    To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).

    100 m away · filed Jan 20, 2025 · Deferred

  • 181 Hallam St · Minor variance

    To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.

    80 m away · filed Jan 23, 2024 · Approved

  • 216 Westmoreland Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.

    30 m away · filed Nov 16, 2023 · Approved

  • 208 Bartlett Ave · Minor variance

    To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.

    240 m away · filed Nov 2, 2023 · Approved

  • 34 Fernbank Ave · Consent

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    180 m away · filed Jun 21, 2023 · Approved

  • 208 Bartlett Ave · Minor variance

    To construct a new three-storey apartment building with front and rear balconies on the second and third floors. There will be a total of 10 dwelling units on this lot. All existing buildings will be demolished.

    240 m away · filed Jun 2, 2023 · Refused

  • 270 Westmoreland Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition with a third storey deck, new side exterior stairs leading to the first and second storeys, and a new rear first storey deck.

    190 m away · filed Mar 6, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.