Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

34 Fernbank Ave

The City of Toronto has 5 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - INTERIOR ALTERATIONS IN ALL FLOORS,NEW SECOND DWELLING UNIT IN BASEMENT, REMOVING EXISTING WALKOUT AND PROPOSE A NEW WALKOUT IN FRONT USING SPACE BELOW PORCH, RECONSTRUCT PORCH, NEW REAR DECK

    Applied Apr 23, 2024 · issued Apr 24, 2024 · Permit 24 132015 PLB

    Inspections under way
  • Heating and ventilation

    Hvac - interior alterations in all floors,new second dwelling unit in basement, removing existing walkout and propose a new walkout in front using space below porch, reconstruct porch, new rear deck

    Applied Apr 12, 2024 · issued May 6, 2024 · Permit 24 132015 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Interior alterations in all floors,new second dwelling unit in basement, removing existing walkout and propose a new walkout in front using space below porch, reconstruct porch, new rear deck

    Applied Apr 3, 2024 · issued Apr 9, 2024 · 1 home added · Permit 24 132015 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct interior alterations to existing dwelling, add a basement unit, reconstruct existing front porch and basement walkout, also add a new deck above porch

    Applied Mar 18, 2024 · completed Mar 21, 2024 · Permit 24 126789 PLB

    Cancelled
  • Small residential project · Multiple projects

    Proposal to construct interior alterations to existing dwelling, add a basement unit, reconstruct existing front porch and basement walkout, also add a new deck above porch

    Applied Mar 18, 2024 · completed Mar 21, 2024 · 1 home added · Permit 24 126789 BLD

    Cancelled

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Other

    To obtain consent for a technical severance to re-establish two residential lots which merged on title.

    Decision: Approved (hearing Aug 30, 2023)

    Filed Jun 21, 2023 · File B0037/23TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 157 Hallam Street

    4 homes · Residential

    200 m away · Condominium · Approved · filed Jun 18, 2025

    Approved
  • 798 Dovercourt Road

    Residential

    490 m away · Condominium · Approved · filed Nov 14, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 195 Hallam St · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a complete third storey addition with a rear balcony.

    70 m away · filed Jan 15, 2026 · Approved

  • 725 Gladstone Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition above the existing rear one-storey addition with a Juliet balcony, that will cantilever over the existing rear basement walkout. The existing ancillary building (detached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.

    130 m away · filed Jun 7, 2024 · Approved

  • 205 Westmoreland Ave · Minor variance

    To convert the existing two-and-one-half-storey semi-detached dwelling into a duplex by constructing a rear two-storey addition, a rear ground floor deck, a covered front porch with a second storey balcony. Also, to construct a new two-storey ancillary building (one car lift from a basement level and one laneway suite with a second storey balcony), in the rear yard, abutting the laneway. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).

    180 m away · filed Apr 2, 2024 · Approved

  • 181 Hallam St · Minor variance

    To alter the existing two-storey townhouse dwelling by reconstructing and enlarging the rear one-storey addition with a rear ground floor deck and reconstructing the rear basement walkout.

    120 m away · filed Jan 23, 2024 · Approved

  • 216 Westmoreland Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear third storey addition with a rear third storey deck.

    150 m away · filed Nov 16, 2023 · Approved

  • 208 Bartlett Ave · Minor variance

    To construct a new four-storey detached apartment building with front and rear balconies on the second, third and fourth storeys, as well as two parking spaces in the rear yard (accessed from Hallam Street). There will be a total of 8 dwelling units (seven one-bedroom and one two-bedroom units) on this lot. All existing buildings will be demolished.

    80 m away · filed Nov 2, 2023 · Approved

  • 27 Southview Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by a complete third storey addition, and a rear one-storey with a roof deck above. Also, to reconstruct the front porch and stairs.

    180 m away · filed Jul 21, 2023 · Approved

  • 208 Bartlett Ave · Minor variance

    To construct a new three-storey apartment building with front and rear balconies on the second and third floors. There will be a total of 10 dwelling units on this lot. All existing buildings will be demolished.

    80 m away · filed Jun 2, 2023 · Refused

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.