Toronto address · Ward 13, Toronto Centre
207 Jarvis St
The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Interior alterations
REVISION 2 - Demolish the existing storage rooms in the basement and keep the basement as is and not move forward with approved floor plan for basement in the previous permitProposed interior alterations to 5 unit dwelling - to remain as a 5 unit dwelling.
Applied Jan 4, 2021 · issued Jan 22, 2021 · Permit 19 136390 BLD (revision 02)
- Inspections under way
Fire and security upgrade · Sprinklers
Proposed: addition of sprinkler system to basement and replace existing clay sewer pipes with new pipes
Applied Jul 2, 2020 · issued Jul 21, 2020 · Permit 20 162462 FSU
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to 5 unit dwelling.
Applied Apr 12, 2019 · issued Jul 16, 2019 · Permit 19 136390 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations to 5 unit dwelling.
Applied Apr 12, 2019 · issued Jul 16, 2019 · Permit 19 136390 HVA
- Inspections under way
Small residential project · Interior alterations
Proposed interior alterations to 5 unit dwelling - to remain as a 5 unit dwelling.
Applied Apr 5, 2019 · issued Jul 16, 2019 · Permit 19 136390 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
32 storeys · 315 homes · Mixed use
20 m away · Rezoning · Under review · filed Mar 31, 2026
- Under review
- Under review
212-218 Dundas Street East and 279 1/2 George Street
44 storeys · 542 homes · Mixed use
230 m away · Condominium · Under review · filed Oct 25, 2021
- Under review
52 storeys · 630 homes · Mixed use
230 m away · Site plan · Under review · filed Mar 18, 2022
- Approved
53 storeys · 591 homes · Mixed use
290 m away · Site plan · Approved · filed Aug 31, 2021
- Under review
47 storeys · 619 homes · Residential
290 m away · Site plan · Under review · filed Sep 16, 2022
Neighbours’ Committee of Adjustment files within 250 m
212 Dundas St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
210 m away · filed Apr 30, 2026 · Approved
134 Jarvis St · Minor variance
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
170 m away · filed Sep 4, 2025 · Approved
53 Mutual St · Minor variance
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
90 m away · filed Jul 23, 2025 · Approved
225 Jarvis St · Minor variance
To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.
70 m away · filed Mar 4, 2025 · Approved
75 Mutual St · Minor variance
To alter the existing three-storey detached building by constructing a fourth storey addition, and a rear four-storey addition. This building will contain a total of 18 dwelling rooms (multi-tenant house).
110 m away · filed Dec 9, 2024 · Approved
203 Jarvis St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-way.
20 m away · filed Sep 17, 2024 · Approved
90 Queen St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
240 m away · filed Aug 19, 2024 · Approved
225 Jarvis St · Minor variance
To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.
70 m away · filed Jun 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.