Toronto address · Ward 11, University-Rosedale
207 McCaul St
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Interior alterations for takeout restaurant in ground floor
Applied Feb 7, 2024 · issued Apr 15, 2024 · Permit 24 112559 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations / change of use, to existing suite, for takeout restaurant in ground floor of an Existing Building (Heritage Building).
Applied Feb 7, 2024 · issued Mar 22, 2024 · Permit 24 112559 BLD
- Inspections under way
Plumbing
Plumbing - Interior alterations for takeout restaurant in ground floor
Applied Feb 7, 2024 · issued Mar 22, 2024 · Permit 24 112559 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
18 storeys · Non-residential
140 m away · Site plan · Under review · filed Jun 1, 2022
- Under review
61 storeys · 475 homes · Residential
210 m away · Site plan · Under review · filed Sep 1, 2021
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
270 m away · Site plan · Under review · filed Aug 28, 2022
- Under review
64 storeys · 579 homes · Mixed use
270 m away · Site plan · Under review · filed Aug 17, 2022
- Approved
- Under review
Not stated in the file
330 m away · Subdivision · Under review · filed Nov 5, 2021
Neighbours’ Committee of Adjustment files within 250 m
28 D'Arcy St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition, and a new rear three-storey addition (with a basement walkout level). Also, to construct a rear exterior staircase that will access each level. There will be a total of 4 residential dwelling units on this lot. The existing rear two-storey ancillary building will be maintained and unaltered.
220 m away · filed Dec 31, 2024 · Approved
202 Beverley St · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear one-storey addition over the existing ground floor deck.
240 m away · filed Nov 6, 2024 · Postponed
700 University Ave · Minor variance
To alter Site Specific Zoning By-law 916-2022 to permit the construction of a development comprised of a 58-storey purpose-built rental residential building and to alter the existing 20-storey office building by constructing an additional 5 storeys.
220 m away · filed Jan 16, 2023 · Approved
700 University Ave · Consent
To obtain consent to sever the property into three lots (one residential lot and two mixed-use lots).
220 m away · filed Jan 16, 2023 · Approved
9 Baldwin St · Minor variance
To alter the existing commercial building by constructing a ground level 32 seat patio (with a pergola) along the side (east) and rear of the building.
130 m away · filed Dec 9, 2022 · Approved
200 Elm St · Minor variance
To convert the existing ground floor commercial space into nine (9) residential dwelling units. This 13-storey building will have a total of 127 residential dwelling units.
140 m away · filed Sep 2, 2022 · Approved
41 Henry St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front basement walkout, a rear two-storey addition with a second floor side balcony, and a rear third storey addition with a rear terrace. One primary unit and two secondary suites will be provided for a total of three dwelling units. Also, the one-storey ancillary building (detached garage) in the rear yard, abutting the laneway, will be maintained.
150 m away · filed May 26, 2022 · Approved
25 Baldwin St · Minor variance
To construct a four-storey mixed-use building with a front third storey platform and a rooftop enclosure providing access to a front fifth storey platform.
160 m away · filed Nov 25, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.