Toronto address · Ward 3, Etobicoke-Lakeshore
208 Evans Ave
The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
1 first party wall sign - 0.914m h x 4.0m w mounted on the first storey of the east elevation.**EVINGTON EXECTUIVE OFFICE SUITES**
Applied Jul 11, 2025 · issued Jul 21, 2025 · completed Feb 12, 2026 · Permit 25 192388 DST
- Revision issued
Addition or alteration · Interior alterations
REVISION 01 - Changes to floor layout as per bubbled drawings
Applied Aug 17, 2017 · issued Aug 22, 2017 · Permit 17 130992 BLD (revision 01)
- Revision issued
Heating and ventilation
REVISION 01 - Revised HVAC layout as per bubbled drawings
Applied Aug 17, 2017 · issued Aug 17, 2017 · Permit 17 130992 HVA (revision 01)
- Inspections under way
Plumbing
Plumbing - Make interior alteration to existing office building to reconfigure the reception area of main floor. Also alterations to existing washrooms and creation of a new universal washroom on main floor. Second floor interior alteratons to create open area above reception. Additon of exterior canopy and enlarge window openings to create a double door.
Applied Mar 20, 2017 · issued Apr 5, 2017 · Permit 17 130992 PLB
- Revocation pending
Heating and ventilation
HVAC - Make interior alteration to existing office building to reconfigure the reception area of main floor. Also alterations to existing washrooms and creation of a new universal washroom on main floor. Second floor interior alteratons to create open area above reception. Additon of exterior canopy and enlarge window openings to create a double door.
Applied Mar 20, 2017 · issued Apr 5, 2017 · Permit 17 130992 HVA
- Inspections under way
Addition or alteration · Interior alterations
Make interior alteration to existing office building to reconfigure the reception area of main floor. Also alterations to existing washrooms and creation of a new universal washroom on main floor. Second floor interior alteratons to create open area above reception. Additon of exterior canopy and enlarge window openings to create a double door.
Applied Mar 20, 2017 · issued Mar 22, 2017 · Permit 17 130992 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
46 storeys · 4,222 homes · Mixed use
320 m away · Subdivision · Approved · filed May 23, 2024
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.